← Back to search

SPARROGRADA, SPARROGRADA,

REFUSED

Planning application 01/3149

Cork - Cork County Council

Application Timeline

  1. Application received

    1 Jun 2001

  2. Decision: REFUSED

    30 Jul 2001

  3. Decision due

    1 Aug 2001

Application Details

Location
SPARROGRADA, SPARROGRADA,
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 June 2001Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
30 July 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

93m
06/2658INCOMPLETED APPLICATION11 Dec 2006

One building of one stable/tackroom and shed for storage

Sparrograda Ballydehob

97m
00/4462CONDITIONAL21 Jul 2000

Retention of dwelinghouse

SPARROGRADA, SPARROGRADA,

108m
06/503INCOMPLETED APPLICATION24 Mar 2006

Shed and 2 stables

Sparrograda Ballydehob

177m
06/1809INCOMPLETED APPLICATION8 Sept 2006

Outbuilding consisting of stable, stable/tackroom and shed for storage

Sparrograda Ballydehob

178m
10/4INCOMPLETED APPLICATION6 Jan 2010

Construction of detached stable and store building

Sparrograda, Ballydehob, Co. Cork

178m
10/22CONDITIONAL15 Jan 2010

Construction of detached stable and store building

Sparrograda, Ballydehob, Co. Cork

332m
07/3012REFUSED3 Dec 2007

Construction of a dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob Co. Cork

332m
08/1419INCOMPLETED APPLICATION30 Jul 2008

Dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob

332m
08/1551WITHDRAWN22 Aug 2008

Construct dwellinghouse, domestic garage, sewage treatment unit and associated site works

Derreennaclogh Ballydehob Co. Cork

340m
23/130REFUSED13 Mar 2023

A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existing on-site tracks and the construction of new on-site access roads. It will also include widening of two junctions along the turbine delivery route. The first is at the N71 - R592 junction in Knockroe townland, east of Ballydehob. These works will consist of the temporary removal of a section of masonry wall, public street lighting stanchion, gate, gate posts, trees and earthern berm and the raising of levels with engineered fill to that of the adjacent N71. The second is at the N71 - L8456 junction in Shronagree townland. These works will consist of the lowering of ground levels to that of the adjacent N71 and L8456 and the removal of traffic signage. Both locations to be restored following turbine delivery. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.

Shronagree, Ballybane East & Knockroe Townlands Ballydehob and Letterlicky Middle Bantry, Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?