← Back to search

LAHARAN, LAHARAN,

CONDITIONAL

Planning application 03/1167

Cork - Cork County Council

Proposed Development

Garage conversion, alterations & extensions to dwellinghouse and construction of new boundary wall

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Mar 2003

  2. Decision due

    12 May 2003

  3. Decision: CONDITIONAL

    12 May 2003

  4. Grant issued

    17 Jun 2003

Application Details

Location
LAHARAN, LAHARAN,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 March 2003
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 May 2003
Grant Date
17 June 2003

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
07/6286CONDITIONAL21 Mar 2007

Construction of slatted shed over existing underground slurry tank and feed passage and installation of underground effluent storage tank

Laharan Carrignavar

32m
07/5028INCOMPLETED APPLICATION14 Feb 2007

Construction of slatted shed over existing underground slurry tank and feed passage and installation of underground effluent storage tank

Laharn Carrignavar

49m
26/2053Awaiting F.I. Response4 Aug 2026

Permission consisting of works to extend the existing staff car park to the front of the existing school building by approx 694.4sqm. Relocation of 4 no. existing car parking spaces, Addition of 16 number new parking spaces. Installation of a new bike shelter to house minimum 14 bicycles. Demolition works to remove approx. 47m length of existing boundary walls inclusive of 1no. double vehicular gate and 1no. pedestrian gate. Removal of existing concrete footpath and concrete median at public road edge. Construction of a new 1200mm high boundary wall with stone capping, new double swing vehicular entrance gate, new pedestrian gate, new 2000mm wide public footpath, new carpark surface and all associated site works.

North Cork Community Special School (formerly known as Scoil an Athar Tadhg), Carrignavar, Cork, Co. Cork, T34 N276

53m
26/1744Invalid - Case Closed29 Jun 2026

The development consists of : • Works to extend the existing staff car park to the front of the existing school building by approx 565sqm to facilitate the addition of 16 number new staff car parking spaces. • Installation of a new bike shelter to house minimum 14 bicycles • Demolition works to remove approx. 47m length of existing boundary wall inclusive of 1no. double vehicular gate and 1no. pedestrian gate and removal of existing concrete median at public road edge. • Construction of a new 1200mm high boundary wall, new double swing vehicular gate, new pedestrian gate, new 2000mm wide public footpath, new carpark surface And all associated site works

Carrignavar, Cork, Co. Cork, T34 N276

60m
23/4935CONDITIONAL10 May 2023

Permission to construct an agricultural shed containing A) Milking parlour with holding yard and effluent tank, B) Drafting area, C) Calf pens, D) Cubicle house with slatted tank, E) Feed bin and ancillary works.

Laharan Carrignavar Co. Cork

83m
26/2054Awaiting F.I. Response4 Aug 2026

The development consists of : • The Construction of a new 23.5sqm ESB sub station and switch room. Works include the demolition of approximately 10m length of existing boundary wall, modification of 10.8m length of existing public footpath and all associated site works • Removal of existing access ramp and footpath and replacement with new universally accessible ramped access route, inclusive of guarding and handrails, from the existing public footpath into the school site. Works include the relocation of the existing pedestrian gate And all associated site works

North Cork Community Special School (formerly known as Scoil an Athar Tadhg), Carrignavar, Cork, Co. Cork, T34 N276

83m
26/1720Invalid - Prepare Letters26 Jun 2026

The development consists of : • The Construction of a new 23.5sqm ESB sub station and switch room. Works include the demolition of approximately 10m length of existing boundary wall, modification of 10.8m length of existing public footpath and all associated site works • Removal of existing access ramp and footpath and replacement with new universally accessible ramped access route, inclusive of guarding and handrails, from the existing public footpath into the school site. Works include the relocation of the existing pedestrian gate And all associated site works

Carrignavar, Cork, Co. Cork, T34 N276

84m
26/0127Awaiting Clarification F.I. Response23 Jan 2026

The development consists of Refurbishment works to the existing school building on the former site of Scoil an Athar Tadhg, to deliver a purpose-built special educational needs school. The works to be retained consist of; The construction of 3 no. pitched roofs and the replacement of existing flat roof areas; A rooftop plant area; Modifications to the existing window openings with the installation of windows and roof lights; A new entrance extension; Internal reconfiguration works to the former school building to provide 6 No. SEN Classrooms and associated ancillary accommodation in line with the Department of Education’s SGD-02-04 design guidance; External hard and soft landscaping to include soft play areas & sensory garden; Alterations to existing staff parking area to provide a new set-down area within curtilage and additional staff parking; Minor alterations to the existing pedestrian gate and external pathways to allow for universal access. And all associated site works

Site of former Scoil an Athar Tadhg, Carrignavar, Co. Cork, T34 N276

97m
13/5219CONDITIONAL26 Jun 2013

The provision of temporary accommodation comprising 1no. cabin for use as a classroom suite and storage, and for associated site development works

Scoil an Athar Tadhg Carraig na bhFear Village Carrignavar Co.Cork

97m
12/5568CONDITIONAL17 Jul 2012

Demolition of existing school building and removal of existing temporary accommodation on completion with the phased construction of a new two storey 16 classroom school building including office space, special education tuition rooms, library and resource rooms, general purpose and multi purpose spaces and ancillary accommodation with a single storey bolt-on 4 classroom ASD unit and associated withdrawal rooms, central activities space and ancillary accommodation, proposed site works to include provision for 42 no. car parking spaces with access from the public road via a new vehicular entrance, including drop-off and pick-up facilities with a set down for drop-off and pick-up associated with the ASD unit along a turning circle, bicycle rack, bus shelter, formation of 2 no. ballcourts, hard surface play spaces, ASD play area, oil tank enclosure, landscaping, boundary treatment and all other associated site development works. The development will also consist of a temporary car park and entrance, play area and boundary treatment with pedestrian and vehicular access points from the main road for use during the construction phase which will be located opposite the school site and this area shall be re-instated on completion of works on the existing school site

Scoil An Athar Tadhg Laharan Carrignavar

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?