Application Timeline
Application received
22 Apr 2003
Decision due
16 Jun 2003
Decision: CONDITIONAL
16 Jun 2003
Grant issued
22 Jul 2003
Application Details
- Location
- BALLYDOYLE, BALLYDOYLE,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 April 2003
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 June 2003
- Grant Date
- 22 July 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of double garage, workshop and private gymnasium with changing room
Ballydoyle Castletownroche
We the Commissioners of Public Works in Ireland intend to apply for 10 year permission for development. The development consists of: Works to and within the curtilage of Protected Structures RPS Nos. 01395, 01396, 01397, 01398 & 01399and partly within the archaeological site RMP CO026 – 058. The project is for the development of new visitor amenities for this historic garden site by refurbishing existing protected structures, providing new buildings and infrastructure including the following: A) Access and Parking: - Local widening of public road at the front entrance, resurfacing outside front entrance gates, upgrade and local widening of existing front drive; new car park to west of front drive; new access and exit roads to new car park, upgrade of Middle Avenue; temporary passing bays and parking at Middle Avenue; new accessible pathways; new opening and vehicular access gate to west side of walled garden. B) Existing Buildings: - Conservation and repair of all existing buildings as well as the following alterations. Milking Parlour: Conversion of attic for shared residential accommodation, altering elevations. Gardener’s Cottage: Demolition, extension, altering elevation, division of cottage to provide 2no residences, permission to use residences for short term let. Calf House & North Stables: New gates. Main House: demolition, lift extension, altering elevations, change of use to exhibition and ancillary offices. South Coach House: Change of use to ticket office, tea room, ancillary office and storage. Forge & Dovecote: Electrical services. Doyle’s Cave & Slate House: New roof, altering elevations, change of use to WCs. South Stable & Barn: Demolitions, extension, altering elevations, permission to use as café and heritage display area. Engine House: New roof, electrical services. Visitor WCs: New service connections. Front Lodge: Demolition, reinstating elevations, permission to use residence for short term let. C) New Buildings: - Construction of 2 new service buildings in the kennel yard; new working depot to the north of Middle Avenue including 1 new staff building and 2 open sided maintenance sheds. D) Services: - Construction of new waste water treatment plant and percolation area to north of Middle Avenue including 1 service shed; new water main and fire water storage tank; new rainwater harvesting tanks; new soakaways; new ESB main and substation; below ground ducts for new site services, new waste water treatment unit for front lodge. E
Annes Grove House & Gardens Castletownroche Co. Cork
Two storey dwellinghouse
Ballinvoher Castletownroche Mallow
Two storey dwellinghouse
BALLINVOHER, BALLINVOHER,
Dwellinghouse
Ballinvoher Castletownroche
Dwellinghouse
Ballinvoher Castletownroche
Construction of extension to dwellinghouse
Naglesborough Castletownroche Mallow
Extension to dwellinghouse
NAGLESBOROUGH, NAGLESBOROUGH,
Continuance of use of existing compost manufacturing facility
BALLINVOHER, BALLINVOHER,
The proposed development comprises; a 325 sq.m extension to the rear of the existing composting building; new electrical room; the relocation of the bio filter plinth to the rear of the proposed extension; the demolition of an existing outbuilding; the upgrade of the existing composting building to include the reconfiguration of the roof profile from a ‘barrel’ pitch roof to an ‘A’ pitch roof and the recladding of the existing structure; upgrade of the existing site drainage to include a class1 inceptor, underground rainwater tanks and a new septic tank and percolation area. The proposed works will facilitate the existing composting building to maintain a consistent negative air pressure. The proposed development includes all ancillary infrastructure and landscaping. The proposed development will be subject to a Waste Facility Permit. A Natura impact Statement accompanies this application.