Proposed Development
Construction of access tunnel under roadway at window and door manufacturing facility
View the full application file on the council's planning portal →Application Timeline
Application received
24 Jan 2003
Decision due
29 Sept 2003
Decision: CONDITIONAL
29 Sept 2003
Grant issued
4 Nov 2003
Application Details
- Location
- LACKANASTOOKA, LACKANASTOOKA,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 24 January 2003
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 September 2003
- Grant Date
- 4 November 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct a 1,524sq.m dispatch yard storage building for the storage of finished products of windows and doors. Permission is also sought to replace the existing north facing dispatch yard blockwork boundary wall with a concrete panel and blockwork pillar type construction together with all ancillary services and associated site works
Lackanastooka Ballydesmond Co. Cork
2 no. wind turbines (80m hub height and 80m blade diameter) with overall height not exceeding 125m high, 2 no. transformers, site track and associated works
Lackanastooka Ballydesmond
The demolition of an existing dwelling and the construction of an industrial production building (3157 sq.m) complete with canteen, toilet and first aid facilities, electrical switch room and office space, solar panels on the south-facing roof section, an adjacent concrete yard (970 sq.m), attenuation drainage system and landscaping works at the Gairdini facility. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.
Lackanastooka Ballydesmond Co. Cork
Construction of four storey office building comprising of reception, offices, file storage room and toilets on ground floor, canteen and toilets on first floor, open plan offices, storage room and toilets on second floor and open plan offices and file storage rooms on third floor
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road.
Munster Joinery Lacka Cross, Lackanastooka Ballydesmond Co. Cork
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road.
Munster Joinery Lacka Cross Lackanastooka, Ballydesmond Co. Cork
A car parking facility complete with flood lighting, access road and new entrance adjacent to public road. Total floor area of 3868sq.m
Munster Joinery Lacka Cross, Lackanastooka Ballydesmond Co. Cork
Retention of an access road, associated retaining walls with a total area of 840sq.m and all associated site and ancillary works.
Lacka Cross Lackanastooka Ballydesmond Co. Cork
Construction of standby diesel generator compound with switchroom at window and door manufacturing facility
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Alteration and extension of existing waste water treatment plant with buried discharge pipeline at window and door manufacturing facility
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?