Construction of four storey office building comprising of reception, offices, file storage room and toilets on ground floor, canteen and toilets on first floor, open plan offices, storage room and toilets on second floor and open plan offices and file storage rooms on third floor

View the full application file on the council's planning portal →

Application Details

Location
Munster Joinery Lacka Cross Lackanastooka Ballydesmond
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
7 February 2008
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

44m
07/5654CONDITIONAL5 Mar 2007

Construction of extension to existing glass manufacturing building for increase in production

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

76m
06/11641INCOMPLETED APPLICATION20 Oct 2006

2 no. wind turbines (80m hub height and 80m blade diameter) with overall height not exceeding 125m high, 2 no. transformers, site track and associated works

Lackanastooka Ballydesmond

87m
03/234CONDITIONAL24 Jan 2003

Construction of access tunnel under roadway at window and door manufacturing facility

LACKANASTOOKA, LACKANASTOOKA,

93m
18/4451CONDITIONAL22 Feb 2018

Construct a 1,524sq.m dispatch yard storage building for the storage of finished products of windows and doors. Permission is also sought to replace the existing north facing dispatch yard blockwork boundary wall with a concrete panel and blockwork pillar type construction together with all ancillary services and associated site works

Lackanastooka Ballydesmond Co. Cork

104m
04/9621CONDITIONAL23 Dec 2004

Extension to building E for PVC extruded material storage at existing window and door manufacturing facility

Munster Joinery Lackanastooka Ballydesmond

129m
03/1255CONDITIONAL20 Mar 2003

Construction of building for the storage of small window and door fittings

LACKA CROSS, LACKA CROSS, LACKANASTOOKA,

133m
11/6250INCOMPLETED APPLICATION20 Oct 2011

Construction of a 457m2 extension to the Aluclad building. The building extension will be used to provide additional floor space for the production of Aluclad window and doors

Lacka Cross Lackanastooka Ballydesmond

149m
12/4150CONDITIONAL3 Feb 2012

A 457m2 extension to the Aluclad building. The building extension will be used to provide additional floor space for the production of Aluclad windows and doors. The proposed works will also necessitate the deconstruction of 2 no. wood drying kilns to clear the area for the proposed extension.

Lacka Cross Lackanastooka Ballydesmond Co. Cork

149m
11/6702INCOMPLETED APPLICATION23 Dec 2011

Construction of 457sqm extension to the Aluclad building. The building extension will be used to provide additional floor space for the production of Aluclad windows & doors. The proposed works will also necessitate the deconstruction of 2no. wood drying kilns to clear the area for the proposed extension

Lacka Cross Lackanastooka Ballydesmond

149m
12/4096INCOMPLETED APPLICATION26 Jan 2012

Construction of a 457m2 extension to the Aluclad building. The building extension will be used to provide additional floor space for the production of Aluclad windows and doors

Lacka Cross Lackanastooka Ballydesmond Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?