Proposed Development
Extension to fermentor building, to house contingency fermentor, link corridor & a 2 storey extension to utilities bay to service the fermentor
View the full application file on the council's planning portal →Application Timeline
Application received
20 Aug 2003
Decision due
14 Oct 2003
Decision: CONDITIONAL
14 Oct 2003
Grant issued
19 Nov 2003
Application Details
- Location
- BRINNY, BRINNY,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 August 2003
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 October 2003
- Grant Date
- 19 November 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of single storey steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of two storey extension and single storey extension to eastern elevation and two storey extension to Western elevation to OPS 2 Production building
Brinny Innishannon
Extensions to existing Operations 2 building to provide additional production, office and storage accommodation comprising of two storey extension and single storey extension to Eastern elevation and two storey extension to Western elevation
Brinny Innishannon
Demolition of a single storey solvent washroom annex to existing production building and construction of extension to house production plant
Brinny, Innishannon
Construction of phased extensions to existing OPS 2 Production Building comprising of two storey extension to eastern elevation and two storey extension to western elevation
Brinny Innishannon
Retention of alterations to permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift and the Operations 1 building, from 11.2sqm to 22.9sqm.,(2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) and the extension of the canopy roof over the yard enclosure to form a weather tight storage building (65.4sqm)
Brinny Innishannon
Construction of 11m high two storey extension over basement to northern elevation of existing Operations 2 building No. 19 to provide further production space within existing pharmaceutical facility
Brinny Innishannon
Retention of alterations to the permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift & the Operations 1 building, from 11.2sqm to 22.9sqm, (2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) & the extension of the canopy roof over the Yard Enclosure to form a weather tight storage building (65.4sqm)
Brinny Innishannon
Construction of two storey modular office building extension to existing single storey locker room building within Pharmaceutical Production facility
Brinny Innishannon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?