Planning application 08/8019

Cork - Cork County Council

Proposed Development

Construction of 11m high two storey extension over basement to northern elevation of existing Operations 2 building No. 19 to provide further production space within existing pharmaceutical facility

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jul 2008

  2. Decision due

    15 Sept 2008

  3. Decision: CONDITIONAL

    15 Sept 2008

  4. Grant issued

    16 Oct 2008

Application Details

Location
Brinny Innishannon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
22 July 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 September 2008
Grant Date
16 October 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
09/7294INCOMPLETED APPLICATION12 Oct 2009

Retention of alterations to the permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift & the Operations 1 building, from 11.2sqm to 22.9sqm, (2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) & the extension of the canopy roof over the Yard Enclosure to form a weather tight storage building (65.4sqm)

Brinny Innishannon

0m
07/7904CONDITIONAL17 May 2007

Construction of two storey modular office building extension to existing single storey locker room building within Pharmaceutical Production facility

Brinny Innishannon

6m
09/7398CONDITIONAL21 Oct 2009

Retention of alterations to permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift and the Operations 1 building, from 11.2sqm to 22.9sqm.,(2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) and the extension of the canopy roof over the yard enclosure to form a weather tight storage building (65.4sqm)

Brinny Innishannon

7m
06/6127CONDITIONAL5 Apr 2006

Construction of single storey steel framed and cladded gas cylinder storage building

Brinny Innishannon

7m
06/4890INCOMPLETED APPLICATION17 Feb 2006

Construction of steel framed and cladded gas cylinder storage building

Brinny Innishannon

7m
07/5599INCOMPLETED APPLICATION2 Mar 2007

Construction of two storey extension and single storey extension to eastern elevation and two storey extension to Western elevation to OPS 2 Production building

Brinny Innishannon

7m
03/4178CONDITIONAL20 Aug 2003

Extension to fermentor building, to house contingency fermentor, link corridor & a 2 storey extension to utilities bay to service the fermentor

BRINNY, BRINNY,

7m
07/6860CONDITIONAL5 Apr 2007

Extensions to existing Operations 2 building to provide additional production, office and storage accommodation comprising of two storey extension and single storey extension to Eastern elevation and two storey extension to Western elevation

Brinny Innishannon

7m
04/8788CONDITIONAL30 Nov 2004

Demolition of a single storey solvent washroom annex to existing production building and construction of extension to house production plant

Brinny, Innishannon

7m
06/13568INCOMPLETED APPLICATION20 Dec 2006

Construction of phased extensions to existing OPS 2 Production Building comprising of two storey extension to eastern elevation and two storey extension to western elevation

Brinny Innishannon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?