← Back to search

TERRYS-LAND, TERRYS-LAND,

UNCONDITIONAL

Planning application 03/582

Cork - Cork County Council

Application Timeline

  1. Application received

    14 Feb 2003

  2. Decision due

    10 Apr 2003

  3. Decision: UNCONDITIONAL

    10 Apr 2003

  4. Grant issued

    16 May 2003

Application Details

Location
TERRYS-LAND, TERRYS-LAND,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 February 2003
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
10 April 2003
Grant Date
16 May 2003

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

26m
08/7898WITHDRAWN15 Jul 2008

Bus shelter with 2 no. illuminated advertising panels

Existing Bus Stop Outside entrance to IDA Business & Technology Park Terry's-Land Carrigtohill

102m
26/0873Invalid - Case Closed8 Apr 2026

The development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III Directive EU 2023/2413, and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000 as amended. When a notice issues in accordance with section 34D b, the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

GE Healthcare campus at, IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60

102m
22/4781WITHDRAWN7 Apr 2022

Permission for the following (1) the construction of a new site entrance (2) the construction/ installation of approximately 470m new 2.4m high green palisade security fencing / gate (3) the demolition / demounting of approximately 170m of existing mesh fencing and (4) all associated site works including footpath, lighting and CCTV at IDA business Park

GE Healthcare Irealnd Ltd. IDA Business Park, Tullagreen Carrigtwohill Co.Cork

102m
26/1972Awaiting Recommendation24 Jul 2026

GE Healthcare Ireland Limited intends to apply to the Planning Authority mentioned above for permission for a development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Terry’s Land and Tullagreen Townlands, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant Planning Authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

GE Healthcare campus at, IDA Business Park, Terrys Land and Tullagreen townlands, Carrigtwohill, Co. Cork, T45 AV60

137m
15/4093CONDITIONAL20 Jan 2015

Two-storey manufacturing and assembly building, including production and administration areas, a new site entrance and access road, car parking and external storage and gas compound areas, together with all associated site works

IDA Business & Technology Park Tullagreen Terry's-Land Carrigtwohill

137m
14/6702INCOMPLETED APPLICATION16 Dec 2014

Construction of new two-storey manufacturing and assembly building, including production and administration areas, a new site entrance and access road, car parking and external storage and gas compound areas together with all associated site works

IDA Business & Technology Park Tullagreen Carrigtwohill Co.Cork

174m
11/5806CONDITIONAL23 Aug 2011

Extension to rear of dwelling, modifications to existing eastern and western elevations, construction of a new dormer type roof over entire house containing 2 no. bedrooms and a bathroom

Terry's-Land Carrigtwohill

176m
20/4848CONDITIONAL27 Apr 2020

For use of a single storey classroom, permitted as a temporary building under planning registration no. 17/6292, on a permanent basis.

Mary Geary Childcare Carrigtwohill Co. Cork

176m
20/4370INCOMPLETED APPLICATION24 Feb 2020

Permission for use of a single storey classroom, permitted as a temporary building under planning registration no. 17/6292, on a permanent basis.

Mary Geary Childcare Terry's-Land Carrigtwohill Co Cork

180m
12/4037UNCONDITIONAL13 Jan 2012

Completion of a dwelling as permitted under planning reg 06/11556

Terrys-Land Carrigtohill Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?