Existing Bus Stop Outside entrance to IDA Business & Technology Park Terry's-Land Carrigtohill
WITHDRAWNPlanning application 08/7898
Cork - Cork County Council
Proposed Development
Bus shelter with 2 no. illuminated advertising panels
Application Details
- Location
- Existing Bus Stop Outside entrance to IDA Business & Technology Park Terry's-Land Carrigtohill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 July 2008
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1 no. entrance sign
TERRYS-LAND, TERRYS-LAND,
Permission for the following (1) the construction of a new site entrance (2) the construction/ installation of approximately 470m new 2.4m high green palisade security fencing / gate (3) the demolition / demounting of approximately 170m of existing mesh fencing and (4) all associated site works including footpath, lighting and CCTV at IDA business Park
GE Healthcare Irealnd Ltd. IDA Business Park, Tullagreen Carrigtwohill Co.Cork
The development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III Directive EU 2023/2413, and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000 as amended. When a notice issues in accordance with section 34D b, the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
GE Healthcare campus at, IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60
GE Healthcare Ireland Limited intends to apply to the Planning Authority mentioned above for permission for a development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Terry’s Land and Tullagreen Townlands, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant Planning Authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
GE Healthcare campus at, IDA Business Park, Terrys Land and Tullagreen townlands, Carrigtwohill, Co. Cork, T45 AV60
Extension to rear of dwelling, modifications to existing eastern and western elevations, construction of a new dormer type roof over entire house containing 2 no. bedrooms and a bathroom
Terry's-Land Carrigtwohill
Two-storey manufacturing and assembly building, including production and administration areas, a new site entrance and access road, car parking and external storage and gas compound areas, together with all associated site works
IDA Business & Technology Park Tullagreen Terry's-Land Carrigtwohill
Construction of new two-storey manufacturing and assembly building, including production and administration areas, a new site entrance and access road, car parking and external storage and gas compound areas together with all associated site works
IDA Business & Technology Park Tullagreen Carrigtwohill Co.Cork
Completion of a dwelling as permitted under planning reg 06/11556
Terrys-Land Carrigtohill Co. Cork
Dwelling
Terry's-Land Carrigtohill
Retention and completion of dwelling and all associated site works.
Terry's-Land Carrigtohill Co. Cork
The submission window has closed
Observations on this application closed on Monday 18 August 2008, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?