← Back to search

O'Learys Seafort Ballinrea Carrigaline

CONDITIONAL

Planning application 04/1393

Cork - Cork County Council

Proposed Development

20 metre monopole with associated equipment and fencing for a new 3G broadband network

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2004

  2. Decision due

    17 Jun 2004

  3. Decision: CONDITIONAL

    17 Jun 2004

  4. Grant issued

    23 Jul 2004

Application Details

Location
O'Learys Seafort Ballinrea Carrigaline
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
4 March 2004
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 June 2004
Grant Date
23 July 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
11/5278INCOMPLETED APPLICATION14 Jun 2011

Continuance of use of a 20 metre monopole with associated equipment and fencing which forms part of a 3G communications network (previously granted under Planning Reg. No. 04/1393)

O'Leary's Seafort Ballinrea Carrigaline

0m
12/6416CONDITIONAL26 Nov 2012

Retention of an existing 20 metre monopole with associated equipment and fencing, previously granted permission under Planning Reg. No. 04/1393, which forms part of an existing 3G broadband communications network

O'Leary's Seafort Ballinrea Carrigaline

117m
25/6725Grant with Conditions9 Dec 2025

Permission for construction of an agricultural livestock shed with underground slatted slurry storage tanks and handling facilities and all associated siteworks.

Ballinrea, Carrigaline, Co. Cork.

530m
09/4297WITHDRAWN2 Feb 2009

Construction of 2 no. 18 hole golf courses and associated practice areas, reserved site for future clubhouse application (permission now being sought for proprietary effluent treatment system for future clubhouse), demolition of existing properties on site to include 1 no. habitable dwelling and agricultural sheds,conversion of 1 no. habitable dwelling to staff facilities,construction of replacement two storey dwellinghouse over basement with waste water treatment system on separate adjoining site, construction of primary maintenance facility & satellite/secondary maintenance facility with individual proprietary waste water treatment units and all ancillary works and alterations to include groundworks and alterations to ground levels and landscaping.The primary maintenance facility (incorporating staff facilities building, sand bays,fuel tank,chemical/fuel store, wash bays, machinery storage shed, conversion of farm building to workshop & ancillry parking)will be accessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access is also sought to secondary maintenance facility (incorporating sand bays, machinery storage shed, fuel tank & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site. Leisure facilities are proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility to include buggy shed and storage shed for golf equipment, 9 hole academy course, driving range/practice & learning facility & attendant driving range bays,bus parking areas,turf nurserys,footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from ,and modifications to,the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha

Ballinrea Ballinimlagh Ballinrea South

530m
08/10388INCOMPLETED APPLICATION23 Dec 2008

2no. 18-hole golf courses & associated practice areas & 9-hole short course area, reserved site for future clubhouse application (permission now being sought for an effluent treatment system for that future clubhouse), demolition of existing properties on site including 1no. habitable dwelling & miscellaneous agricultural sheds, conversion of 1no.habitable dwelling to staff facilities, construction of a replacement two-storey dwellinghouse over basement with individual wastewater treatment system on a separate adjoining site at Ballinrea South, all ancillary works & alterations including groundworks & alteration of ground levels & landscaping.The proposed golf club will also allow for ancillary development including 2no. maintenance facilities with associated structures (The northern maintenance facility will be a secondary/satellite facility to the main one), the primary maintenance facility (incorporating staff facilities building, sand bays, wash bays, machinery storage shed, workshop & ancillry parking)will be assessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access to secondary maintenance facility (incorporating sand bays, machinery storage shed & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site & leisure facilities now proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility with 9-hole academy course, driving range/practice & learning facility & attendant driving range bays, turf nurserys, footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha

Ballinrea Ballinrea South Ballinimlagh

639m
08/8807CONDITIONAL9 Sept 2008

Construction of cubicle house, slatted channel, lined lagoon and associated works

Ballinrea Carrigaline

743m
07/8492REFUSED8 Jun 2007

Dwelling

Ballinrea Carrigaline

762m
08/9011CONDITIONAL24 Sept 2008

Construction of dwelling, installation of treatment unit and replacement of septic tank serving existing dwelling with treatment unit and associated site works

Ballinrea Carrigaline

764m
23/6346Refused23 Nov 2023

Permission for a detached dwelling, new vehicular entrance, new potable well, new bio filtration treatment unit and all associated site works.

Ballinrea Road Ballinrea Td Carrigaline Co. Cork

802m
23/5357Refused3 Jul 2023

Permission for a single storey residential care unit for service users with intellectual disabilities; consisting of 2 self-catering residential units; 3 bedroom respite area; one bedroom staff accommodation; detached store with covered link to main building; waste water treatment unit with associated percolation area; associated site works and upgrade of existing site entrance.

Ballinrea Carrigaline Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?