Application Timeline

  1. Application received

    19 Jan 2004

  2. Decision: CONDITIONAL

    11 Mar 2004

  3. Decision due

    14 Mar 2004

  4. Grant issued

    16 Apr 2004

Application Details

Location
Garranekinnefeake Jamesbrook Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
19 January 2004
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 March 2004
Grant Date
16 April 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

206m
03/1617CONDITIONAL8 Apr 2003

First floor extension to rear of dwellinghouse

GARRANEKINNEFEAKE, GARRANEKINNEFEAKE,

206m
07/12712CONDITIONAL28 Nov 2007

Construction of sunroom extension to dwelling

Garranekinnefeake East Ferry Midleton

506m
26/2051Awaiting Recommendation3 Aug 2026

The development will consist of an electrical storage facility within a site area of up to 4.2 hectares and comprise a Battery Energy Storage System (BESS) compound to include: battery units and inverters with connecting cabling; switchroom and diesel generator; two steel storage containers; modular office and welfare building; crane hardstanding; 262 metre length internal access tracks and up to four parking bays; foul and surface water drainage system including attenuation pond; palisade security fencing; landscaping; CCTV system; approximately 90 metre length 33kV double-circuit underground grid connection cable to the adjacent permitted Rathcoursey 110kV substation (An Coimisiún Pleanála Reference. ABP 318685-23) and associated electrical ducting; and all ancillary development. Vehicular access to the development will occur via the permitted Rathcoursey 110kV substation access tracks (ABP-318685-23). A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during the office hours at the office of the relevant planning authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Rathcoursey West and Rathcoursey East, Midleton, Co. Cork

538m
06/5022INCOMPLETED APPLICATION23 Feb 2006

Dwellinghouse

Jamesbrook Midleton

538m
06/6167INCOMPLETED APPLICATION6 Apr 2006

Dwellinghouse and widening and splaying of agricultural entrance to form common entrance to serve proposed dwelling and existing graveyard including access road, turning area and fencing to serve graveyard

Jamesbrook Midleton

581m
06/12130CONDITIONAL9 Nov 2006

Dwellinghouse

Garranekinnefeake East Ferry Midleton

659m
24/4668CONDITIONAL19 Apr 2024

Permission for the erection of a 2 storey extension to the front of their existing single storey dwelling

Garranekinnefeake Midleton co.Cork

689m
11/6260CONDITIONAL21 Oct 2011

Retention of sunroom extention to dwelling house

Garranekinnefeake East Ferry Midleton

733m
08/10102CONDITIONAL12 Dec 2008

Dwelling and installation of septic tank

Garranekinnefeake Midleton

735m
05/8448REFUSED17 Nov 2005

Dwellinghouse