Garranekinnefeake Jamesbrook Midleton
CONDITIONALPlanning application 04/196
Cork - Cork County Council
Proposed Development
Extension to dwelling
View the full application file on the council's planning portal →Application Timeline
Application received
19 Jan 2004
Decision: CONDITIONAL
11 Mar 2004
Decision due
14 Mar 2004
Grant issued
16 Apr 2004
Application Details
- Location
- Garranekinnefeake Jamesbrook Midleton
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 January 2004
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 March 2004
- Grant Date
- 16 April 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
First floor extension to rear of dwellinghouse
GARRANEKINNEFEAKE, GARRANEKINNEFEAKE,
Construction of sunroom extension to dwelling
Garranekinnefeake East Ferry Midleton
The development will consist of an electrical storage facility within a site area of up to 4.2 hectares and comprise a Battery Energy Storage System (BESS) compound to include: battery units and inverters with connecting cabling; switchroom and diesel generator; two steel storage containers; modular office and welfare building; crane hardstanding; 262 metre length internal access tracks and up to four parking bays; foul and surface water drainage system including attenuation pond; palisade security fencing; landscaping; CCTV system; approximately 90 metre length 33kV double-circuit underground grid connection cable to the adjacent permitted Rathcoursey 110kV substation (An Coimisiún Pleanála Reference. ABP 318685-23) and associated electrical ducting; and all ancillary development. Vehicular access to the development will occur via the permitted Rathcoursey 110kV substation access tracks (ABP-318685-23). A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during the office hours at the office of the relevant planning authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Rathcoursey West and Rathcoursey East, Midleton, Co. Cork
Dwellinghouse
Jamesbrook Midleton
Dwellinghouse and widening and splaying of agricultural entrance to form common entrance to serve proposed dwelling and existing graveyard including access road, turning area and fencing to serve graveyard
Jamesbrook Midleton
Dwellinghouse
Garranekinnefeake East Ferry Midleton
Permission for the erection of a 2 storey extension to the front of their existing single storey dwelling
Garranekinnefeake Midleton co.Cork
Retention of sunroom extention to dwelling house
Garranekinnefeake East Ferry Midleton
Dwelling and installation of septic tank
Garranekinnefeake Midleton
Dwellinghouse
Garranekinnefeake Midleton
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?