← Back to search

Garranekinnefeake East Ferry Midleton

CONDITIONAL

Planning application 07/12712

Cork - Cork County Council

Proposed Development

Construction of sunroom extension to dwelling

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Nov 2007

  2. Decision: CONDITIONAL

    29 Jan 2008

  3. Decision due

    31 Jan 2008

  4. Grant issued

    29 Feb 2008

Application Details

Location
Garranekinnefeake East Ferry Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
28 November 2007
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 January 2008
Grant Date
29 February 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
03/1617CONDITIONAL8 Apr 2003

First floor extension to rear of dwellinghouse

GARRANEKINNEFEAKE, GARRANEKINNEFEAKE,

206m
04/196CONDITIONAL19 Jan 2004

Extension to dwelling

Garranekinnefeake Jamesbrook Midleton

345m
26/2051Awaiting Recommendation3 Aug 2026

The development will consist of an electrical storage facility within a site area of up to 4.2 hectares and comprise a Battery Energy Storage System (BESS) compound to include: battery units and inverters with connecting cabling; switchroom and diesel generator; two steel storage containers; modular office and welfare building; crane hardstanding; 262 metre length internal access tracks and up to four parking bays; foul and surface water drainage system including attenuation pond; palisade security fencing; landscaping; CCTV system; approximately 90 metre length 33kV double-circuit underground grid connection cable to the adjacent permitted Rathcoursey 110kV substation (An Coimisiún Pleanála Reference. ABP 318685-23) and associated electrical ducting; and all ancillary development. Vehicular access to the development will occur via the permitted Rathcoursey 110kV substation access tracks (ABP-318685-23). A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during the office hours at the office of the relevant planning authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Rathcoursey West and Rathcoursey East, Midleton, Co. Cork

594m
06/5022INCOMPLETED APPLICATION23 Feb 2006

Dwellinghouse

Jamesbrook Midleton

594m
06/6167INCOMPLETED APPLICATION6 Apr 2006

Dwellinghouse and widening and splaying of agricultural entrance to form common entrance to serve proposed dwelling and existing graveyard including access road, turning area and fencing to serve graveyard

Jamesbrook Midleton

625m
23/5270Refused22 Jun 2023

10 year planning permission for a solar farm with a total area of circa 126 hectares comprising of solar panels on ground mounted frames with a surface area of circa 532,000m2, 21 no. single storey electrical inverter/transformer stations, 5 no. single storey energy storage modules, 3 no. single storey spare parts containers, 12 no. ring main units, 5 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the R630, L7657, L7658 and L7659 public roads to connect to solar farm field parcels, security fencing, CCTV, access tracks, 1 no. drain deck crossing, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from L7657, L7658 and L7659. The operational life span of the solar farm will be 40 years and planning permission is requested for its duration. A Natura Impact Statement (NIS) has been prepared and submitted to the planning authority with the application.

Bawnard East, Bawnard West, Garranekinnefeake, Jamesbrook, Kilva, Rathcoursey East, Scartlea Lower, Scartlea Upper, Co.Cork

652m
26/2156Awaiting Recommendation17 Aug 2026

Permission for :- 1) Construction of a new part single storey, part storey and a half, detached dwelling, 2) Installation of a new wastewater treatment unit, 3) New site entrance and all associated site works.

Jamesbrook, Saleen, Garranekinnefeake, Midleton, Co. Cork.

764m
06/12130CONDITIONAL9 Nov 2006

Dwellinghouse

Garranekinnefeake East Ferry Midleton

795m
08/7588CONDITIONAL30 Jun 2008

Dwelling and treatment unit

Garranekinnefeake Saleen Midleton

802m
06/8072INCOMPLETED APPLICATION14 Jun 2006

Dwellinghouse and garage

Rathcoursey East Midleton

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?