Proposed Development
A new single storey security building and the recladding of the South and West Elevations of the existing electrical sub-station; Alterations to and a new single storey extension to the existing two storey maintenance operations building 105; New single storey recycling building: A new wind measuring station on the existing production building 7003 and associated works.
Application Timeline
Application received
15 Jun 2004
Decision due
9 Aug 2004
Decision: CONDITIONAL
9 Aug 2004
Grant issued
14 Sept 2004
Application Details
- Location
- Curraghbinny, Carrigaline
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 June 2004Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 August 2004
- Grant Date
- 14 September 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of an existing single storey lobby and construction, in its place of a single storey part lobby part new laboratory extension to northern elevation of existing Production Building 8/9 and associated internal alterations and external works at their site at Currabinny, Carrigaline.
Lough Beg Currabinny Carrigaline, Co Cork
Construction of 2 no. single storey utilities buildings, alterations to elevations of existing maintenance building 105 and extensions to production building 101 including alterations to elevations and associated site works
Currabinny Carrigaline
Construct a walled silage slab with concrete apron and all associated site works
Curraghbinny Co. Cork .
Dwelling and proprietary waste water treatment unit and installation of proprietary waste water treatment unit to serve existing dwelling
Curraghbinny Carrigaline
Retention of new access roadway adjacent to foreshore, raised fill and excavated site levels for the purpose of site access and hardstanding areas for external storage of pre-cast concrete stone pillars, retention of steel frame structure used for the manufacture of pre-cast concrete stone pillars, and steel shipping container for storage of tools, cement etc.
Loughbeg Ringaskiddy Co.Cork
Retention of new access roadway adjacent to foreshore, retention of revised fill and excavated site levels for the purpose of site access and hardstanding areas for external storage of pre-cast concrete stone pillars, retention of steel frame structure used for the manufacture of pre-cast concrete stone pillars, retention of steel shipping container for storage of tools, cement etc.
Loughbeg Ringaskiddy
Construction of dwelling and adjoining garage, a treatment system, a domestic entrance and all associated site works
Curraghbinny Carrigaline Co. Cork
Dwellinghouse
Currabinny Carrigaline
Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.
Loughbeg Ringaskiddy Co Cork
Demolition of dwelling and outbuilding and construction of two storey dwelling over basement with first floor terrace
Strand Farm Curraghbinny Carrigaline
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?