Proposed Development
Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.
Application Timeline
Application received
28 Apr 2023
Decision due
22 Jun 2023
Decision: CONDITIONAL
22 Jun 2023
Grant issued
27 Jul 2023
Application Details
- Location
- Loughbeg Ringaskiddy Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 April 2023Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 June 2023
- Grant Date
- 27 July 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Planning permission for a weathered enclosure to existing external mechanical equipment and associated site works at the existing facility.
Loughbeg Ringaskiddy Co. Cork
The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility
Loughbeg Ringaskiddy
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.
Loughbeg Ringaskiddy Co. Cork
Construction of 2 no. single storey utilities buildings, alterations to elevations of existing maintenance building 105 and extensions to production building 101 including alterations to elevations and associated site works
Currabinny Carrigaline
Single storey extension to existing electrical building 108 including alterations to elevations, construction of first floor electrical room extension on existing waste water treatment facility and associated civil works
Curraghbinny Carrigaline
Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy Co. Cork
Retention of new access roadway adjacent to foreshore, raised fill and excavated site levels for the purpose of site access and hardstanding areas for external storage of pre-cast concrete stone pillars, retention of steel frame structure used for the manufacture of pre-cast concrete stone pillars, and steel shipping container for storage of tools, cement etc.
Loughbeg Ringaskiddy Co.Cork
Retention of new access roadway adjacent to foreshore, retention of revised fill and excavated site levels for the purpose of site access and hardstanding areas for external storage of pre-cast concrete stone pillars, retention of steel frame structure used for the manufacture of pre-cast concrete stone pillars, retention of steel shipping container for storage of tools, cement etc.
Loughbeg Ringaskiddy
Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years
Loughbeg Industrial Estate Loughbeg Ringaskiddy
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?