← Back to search

Loughbeg Ringaskiddy Co. Cork

CONDITIONAL

Planning application 20/4200

Cork - Cork County Council

Proposed Development

  1. a)
    The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility
  2. b)
    the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility
  3. c)
    all associated modifications and site development works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Feb 2020

  2. Decision: CONDITIONAL

    27 May 2020

  3. Decision due

    22 Jun 2020

  4. Grant issued

    30 Jun 2020

Application Details

Location
Loughbeg Ringaskiddy Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 February 2020Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 May 2020
Grant Date
30 June 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

66m
11/6527CONDITIONAL2 Dec 2011

Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy .

66m
11/6483INCOMPLETED APPLICATION25 Nov 2011

Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas

Loughhbeg Ringaskiddy Co. Cork

102m
18/7056CONDITIONAL22 Nov 2018

Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.

Loughbeg Ringaskiddy Co. Cork

145m
17/7092CONDITIONAL28 Nov 2017

Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy Co. Cork

195m
13/6262CONDITIONAL29 Nov 2013

The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility

Loughbeg Ringaskiddy

249m
10/4078INCOMPLETED APPLICATION20 Jan 2010

Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years

Loughbeg Industrial Estate Loughbeg Ringaskiddy

573m
23/4846CONDITIONAL28 Apr 2023

Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.

Loughbeg Ringaskiddy Co Cork

615m
12/5399WITHDRAWN27 Jun 2012

Change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile cold bitumen recycling mixing equipment

Ringaskiddy Co. Cork .

615m
12/5123INCOMPLETED APPLICATION25 May 2012

For the change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile mixing equipment

Ringaskiddy Co.Cork .

675m
08/8235INCOMPLETED APPLICATION1 Aug 2008

New entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing,signage, lighting and landscaping

Loughbeg Ringaskiddy

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?