Proposed Development
Demolition of extension, construction of one and half storey and single storey extension to dwelling, septic tank and percolation area
View the full application file on the council's planning portal →Application Timeline
Application received
21 Sept 2004
Decision: CONDITIONAL
10 Jan 2005
Decision due
11 Jan 2005
Grant issued
15 Feb 2005
Application Details
- Location
- Gortacrue, Midleton
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 September 2004
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 January 2005
- Grant Date
- 15 February 2005
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwelling, garage, septic tank, percolation area, well, new site entrance & associated site works
Gortacrue Midleton
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary new haul road. A Natura Impact Statement (NIS) has been prepared and submitted to the authority with this application.
Gortacrue Midleton Co. Cork
Installation of a cattle underpass, soiled water tank and associated works.
Gortacrue Midleton Co. Cork
Construction of an animal house incorporating cubicles, slatted tank and feed passage
Gortacrue Midleton Co.Cork
Removal of existing silage slab, construction of a new silage pit with concrete apron and an animal house consisting of cubicles, slatted tank, feed passage and straw bedded area, and associated site works
Gortacrue Midleton Co.Cork
Construction of an animal house, floatation channel and batch crush area and associated site works
Gortacrue Midleton Co.Cork
Construction of a silage slab, concrete apron, roofed holding yard and crush area including a roofed slatted tank and extension to milking parlour and associated works.
Gortacrue Midleton Co. Cork
Construction of a calf house and associated works
Gortacrue Midleton Co.Cork