Application Timeline

  1. Application received

    6 Dec 2004

  2. Decision: CONDITIONAL

    3 Feb 2005

  3. Decision due

    8 Feb 2005

  4. Grant issued

    11 Mar 2005

Application Details

Location
Farranavarrigane Macroom
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 December 2004Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 February 2005
Grant Date
11 March 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

515m
04/2126CONDITIONAL31 Mar 2004

Dwellinghouse

Inchinashingane Macroom

647m
24/6317WITHDRAWN5 Dec 2024

Permission to carry out the following on the site of their existing baby food production facility. Permission for (1) Construction of a new hardstanding compound to the north of the existing 38Kva substation. The compound to be secured with 2.9m high palisade fence, (2) Installation of 5MW (5x1MW) of hydrotreated vegetable oil (HVO) stationary standby generators for emergency electricity generation, each generator is enclosed in a weatherproof container (2.8m high x 0.8m Long x 5.0m wide). (3) Installation of 2 no. transformers within the compound and associated cabling. (4) Extension to the existing concrete roadway to access the compound. (5) All associated site works. The development relates to an activity in relation to which a revised Integrated Pollution Prevention and Control Licence is required

Inchinashingane Macroom Co. Cork

685m
09/7658CONDITIONAL17 Nov 2009

Alterations & extension to garage (including raising of roof pitch), and retention of first floor dormer windows to front of dwelling

Inchinashingane Macroom

722m
17/4947CONDITIONAL19 Apr 2017

Extension to the existing timber frame building manufacturing facility, for the purpose of timber frame building manufacturing and storage

IDA Industrial Estate Coolcour Macroom Co. Cork

727m
04/8986CONDITIONAL7 Dec 2004

Factory building with offices and dispatch area to manufacture timber framed buildings including site develoment works, services and construction of access road

Coolcour Macroom

747m
24/4046CONDITIONAL15 Jan 2024

Permission for the construction of an extension of area approx. 5,122 sq.metres to the existing manufacturing building, and the construction of a canopy of area approx. 1,188 sq.metres over vehicle parking area at east side of proposed extension, and vehicular parking, and all ancillary services and associated site works to the existing timber frame building manufacturing facility.

Cygnum Timber Frame Ltd IDA Industrial Estate Coolcour Macroom Co Cork

748m
19/4673INCOMPLETED APPLICATION20 Mar 2019

The construction of an Extension to the existing Timber Frame Building Manufacturing Facility, for the purpose of Timber Frame Building Manufacturing and Storage.

IDA Industiral Estate Coolcour Macroom Co. Cork

749m
19/4963CONDITIONAL17 Apr 2019

Construction of an extension to the existing timber frame building manufacturing facility, for the purpose of timber frame building manufacturing and storage

IDA Industrial Estate Coolcour Macroom, Co Cork P12 P623

749m
22/5456CONDITIONAL21 Jun 2022

Permission for the installation of rooftop photovoltaic solar panel arrays consisting of approximately 1,000 square metres of solar panels on the eastern roof slopes, and approximately 1,000 square metres of solar panels on the western roof slopes of the existing manufacturing building, and all ancillary services and associated site works.

IDA Industrial Estate Coolcour Macroom Co. Cork

749m
22/5169INCOMPLETED APPLICATION20 May 2022

Permission for the installation of rooftop photovoltaic solar panel array consisting of approximately 1,000 square meters of solar panels on the eastern roof slopes, and approximately 1,000 square meters of solar panels on the western roof slopes of the existing building, and all ancillary services and associated site works

IDA Industrial Estate Coolcour Macroom Co.Cork