← Back to search

Farranshonikeen Ballyhea Charleville

CONDITIONAL

Planning application 05/1002

Cork - Cork County Council

Application Timeline

  1. Application received

    23 Feb 2005

  2. Decision due

    19 Apr 2005

  3. Decision: CONDITIONAL

    19 Apr 2005

  4. Grant issued

    25 May 2005

Application Details

Location
Farranshonikeen Ballyhea Charleville
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 February 2005
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 April 2005
Grant Date
25 May 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
05/7285CONDITIONAL6 Oct 2005

Retention of conservatory, bay window, patio door, 3 no. dormer windows and 3 no. velux rooflights to dwelling

Farranshonikeen Ballyhea

140m
07/8429CONDITIONAL6 Jun 2007

Alterations and extension to existing lairage incorporating lairage office and isolation pen, relocation of lorry wash, relocation of entrance and construction of buyers office

Ardnageehy Charleville

170m
07/10536CONDITIONAL27 Aug 2007

Construction of two storey office building

Ardnageehy Charleville

212m
22/5792CONDITIONAL29 Jul 2022

(a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate the truck washing and sanitary pre-treatment systems (e) to modify the internal road layout. The existing development relates to an activity which requires an Integrated Pollution Control Licence.

Ardnageehy Charleville Co Cork

214m
13/4352CONDITIONAL4 Mar 2013

Retention of a lean-to structure off an existing building with open front and sides

Ardnageehy Charleville

217m
08/7606CONDITIONAL30 Jun 2008

Extension to existing maturation chill together with a tray wash facility,tray store & intake bay, link corridor from existing boning hall to the proposed maturation chill and a dry store, site road re-alignment & drainage works. Extension to existing lairage, regrading of the existing stockyard, construction of lairage office building, closure of the existing stock yard entrance, and construction of a new entrance together with associated drainage works. Demolition of existing facilities building, construction of new offal processing unit with staff facilities at first floor level together with associated drainage works. ESB MV substation and customer switch room and associated site works and services

Ardnageehy Charleville

223m
07/6890CONDITIONAL10 Apr 2007

Retention of domestic garage

Ardnageehy Charleville

238m
04/4438CONDITIONAL18 Jun 2004

Retention of domestic garage/store

Ardnageehy Charleville

318m
04/3727CONDITIONAL27 May 2004

Septic tank & percolation area

Ardnageehy Charleville

323m
16/4520CONDITIONAL8 Mar 2016

Retention for 3 no. attached buildings, concrete yard, boundary walls and associated works and for Retention of Change of Use from agriculture to a paunch manure and de-watered sludge storage faculty. Permission is sought to construct a side extension to this paunch and de-watered sludge facility and to extend the existing concrete yard and boundary walls together with contaminated water collection sump and disposal pipework to adjacent wastewater treatment plant and associated works all on their lands.

Ardnageehy Charleville Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?