← Back to search

Ardnageehy Charleville

CONDITIONAL

Planning application 07/8429

Cork - Cork County Council

Proposed Development

Alterations and extension to existing lairage incorporating lairage office and isolation pen, relocation of lorry wash, relocation of entrance and construction of buyers office

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Jun 2007

  2. Decision due

    12 Sept 2007

  3. Decision: CONDITIONAL

    12 Sept 2007

  4. Grant issued

    15 Oct 2007

Application Details

Location
Ardnageehy Charleville
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 June 2007
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 September 2007
Grant Date
15 October 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

32m
07/10536CONDITIONAL27 Aug 2007

Construction of two storey office building

Ardnageehy Charleville

87m
13/4352CONDITIONAL4 Mar 2013

Retention of a lean-to structure off an existing building with open front and sides

Ardnageehy Charleville

95m
22/5792CONDITIONAL29 Jul 2022

(a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate the truck washing and sanitary pre-treatment systems (e) to modify the internal road layout. The existing development relates to an activity which requires an Integrated Pollution Control Licence.

Ardnageehy Charleville Co Cork

96m
08/7606CONDITIONAL30 Jun 2008

Extension to existing maturation chill together with a tray wash facility,tray store & intake bay, link corridor from existing boning hall to the proposed maturation chill and a dry store, site road re-alignment & drainage works. Extension to existing lairage, regrading of the existing stockyard, construction of lairage office building, closure of the existing stock yard entrance, and construction of a new entrance together with associated drainage works. Demolition of existing facilities building, construction of new offal processing unit with staff facilities at first floor level together with associated drainage works. ESB MV substation and customer switch room and associated site works and services

Ardnageehy Charleville

140m
05/1002CONDITIONAL23 Feb 2005

Dwellinghouse

Farranshonikeen Ballyhea Charleville

158m
05/7285CONDITIONAL6 Oct 2005

Retention of conservatory, bay window, patio door, 3 no. dormer windows and 3 no. velux rooflights to dwelling

Farranshonikeen Ballyhea

218m
07/6890CONDITIONAL10 Apr 2007

Retention of domestic garage

Ardnageehy Charleville

225m
04/4438CONDITIONAL18 Jun 2004

Retention of domestic garage/store

Ardnageehy Charleville

323m
04/3727CONDITIONAL27 May 2004

Septic tank & percolation area

Ardnageehy Charleville

363m
06/6089CONDITIONAL4 Apr 2006

Dwelling and garage

Clashganniv Charleville