← Back to search

Ballynabointra Midleton

REFUSED

Planning application 05/3274

Cork - Cork County Council

Proposed Development

Dwellinghouse with attached garage

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 May 2005

  2. Decision: REFUSED

    6 Jul 2005

  3. Decision due

    7 Jul 2005

Application Details

Location
Ballynabointra Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
13 May 2005
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
6 July 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

80m
09/5812REFUSED3 Jun 2009

Two-storey dwellinghouse, septic tank and associated site works

Ballynabointra Midleton

85m
09/7297CONDITIONAL12 Oct 2009

Two-storey dwellinghouse, septic tank and associated site works

Ballynabointra Midleton

159m
08/4218CONDITIONAL18 Jan 2008

Retention and completion of vehicle maintenance facility incorporating two storey office over storage area, installation of proprietary treatment unit and associated site works

Ballynabointra Midleton

210m
12/5448WITHDRAWN3 Jul 2012

Construction of a new transformer house, installation of conveyors and hoppers, change the use, extend and raise the roof of the existing store for the processing and storage of ground limestone agricultural products

Balllynabointra Midleton

210m
12/5154INCOMPLETED APPLICATION29 May 2012

Construction of a new transformer house, change the use, extend and raise the exisitng store for the processing and storage of Ground Limestone Agricultural Products.

Ballynabointra Midleton Co.Cork

231m
25/4738Application Invalid23 Apr 2025

A 20 Year Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and Stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product as its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of c.a 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheel wash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.

Ballynabointra Burgesland Midleton Co.Cork

231m
25/4899Refused15 May 2025

A 20 Year permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area circa (ca) 11 hectare (ha). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordance Datum (MAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the planning authority with the application.

Ballynabointra Burgesland Midleton Co. Cork

231m
25/4497INCOMPLETED APPLICATION21 Mar 2025

Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the environmental protection agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authoririty.

Ballynabointra Midleton Co.Cork

269m
15/4529CONDITIONAL19 Mar 2015

Construction of new gated access to serve the Lagan Concrete site off the Ballynabointra Road. The proposed works include the provision of a wheelwash, 2.4 metre high palisade fencing, traffic signs, road markings, public lighting and all associated site works and services

Milebush Ballynabointra Midleton, Co Cork

269m
15/4390INCOMPLETED APPLICATION27 Feb 2015

Construction of a new access to the south of the Lagan site on the Ballynabointra Road. The proposed works include for the provision of all traffic signs, road markings, public lighting and all associated site works and services

Milebush Midleton Co Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?