Planning application 08/4218

Cork - Cork County Council

Proposed Development

Retention and completion of vehicle maintenance facility incorporating two storey office over storage area, installation of proprietary treatment unit and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jan 2008

  2. Decision: CONDITIONAL

    12 Mar 2008

  3. Decision due

    13 Mar 2008

  4. Grant issued

    14 Apr 2008

Application Details

Location
Ballynabointra Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 January 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 March 2008
Grant Date
14 April 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

159m
05/3274REFUSED13 May 2005

Dwellinghouse with attached garage

Ballynabointra Midleton

235m
09/5812REFUSED3 Jun 2009

Two-storey dwellinghouse, septic tank and associated site works

Ballynabointra Midleton

241m
09/7297CONDITIONAL12 Oct 2009

Two-storey dwellinghouse, septic tank and associated site works

Ballynabointra Midleton

248m
23/6118Conditional Permission20 Oct 2023

The development will consist of the construction of a new storage shed and an external paved yard to facilitate the importation, storage and processing of road planings with an application site of c. 1.0 hectares. The development will comprise- Construction of an external yard comprising a reinforced concrete ground bearing slab (c.2032m2) to store and process imported road planings. Construction of a portal frame storage shed (c.2053m2) to store processed road planings. Installation of sub-surface drainage to collect surface water run-off which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to the ground thereafter).

Burgesland and Ballynabointra Midleton Co. Cork

266m
25/4738Application Invalid23 Apr 2025

A 20 Year Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and Stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product as its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of c.a 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheel wash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.

Ballynabointra Burgesland Midleton Co.Cork

266m
25/4899Refused15 May 2025

A 20 Year permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area circa (ca) 11 hectare (ha). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordance Datum (MAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the planning authority with the application.

Ballynabointra Burgesland Midleton Co. Cork

266m
25/4497INCOMPLETED APPLICATION21 Mar 2025

Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the environmental protection agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authoririty.

Ballynabointra Midleton Co.Cork

277m
12/4480CONDITIONAL13 Mar 2012

Erection of a new Asphalt Plant incorporating an 18.25m above ground level emissions stack, located to the west of the existing quarry void, together with associated site works to include localised re-alignment of the internal haul road and provision of hardstanding; fuel tank; bitumen storage tanks; control cabin and containers

Ballynabointra Midleton Co. Cork

316m
06/5398CONDITIONAL9 Mar 2006

Construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store area, two storey office, external lean-to canopies, signage, detached plant room building, site entrance, internal roadways, provision for car parking, waste water treatment plant and associated site works

Ballynabointra Midleton

316m
12/4278UNCONDITIONAL20 Feb 2012

construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store, two storey office, external lean-to canopies, signage, plant room, site entrance, internal roadways, car parking, waste water treatment and associated works, extension of duration of permission granted under Planning Reg. No. 06/5398 (PL04.223603)

Ballynabointra Midleton

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?