Proposed Development
Dwellinghouse and garage
Application Details
- Location
- Carrigoon Beg Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 7 June 2005
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse and garage
Carrigoon Beg Mallow
Retention Permission for a temporary portacabin and permission for the demolition of a temporary portacabin and construction of a new pre-fabricated portacabin of 49s.q.m., and all associated site development works.
ESB 110kv Station St. Josephs Road Carrigoon Beg Mallow, Co. Cork
Permission for Retention of a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and Permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank for use as staff welfare and all associated site development works.
ESB 110 kV Substation St. Josephs Road Carrigoon Beg Mallow, Co.Cork
Retention permission for a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank, for use as staff welfare, and all associated site development works
ESB 110kV Substation, St.Joseph's Road Carrigoon Beg Mallow Co.Cork
Retention permission for a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank, for use as staff welfare and all associated site works
ESB 110kV Substation St.Josephs Road Carrigoon beg Mallow, Co.Cork
Retention of existing domestic garage and all associated works
Carrigoon More Mallow Co. Cork
To demolish existing georgian columns and roof overhang and to construct (A) new storey and a half extension including porch to front elevation, (B) new single storey flat roof extension to side elevation, (C) new single storey flat roof extension to rear elevation and (D) replace existing window on south western elevation with French doors-all to existing dwellinghouse
Carrigoon Beg Mallow Co. Cork
First floor extension and change of facade of front elevation of existing dwelling
St. Joseph's Road Carrigoon More Mallow
Alterations to existing 110kV electrical transformer station to include installation of 2 no. 38kV/MV transformers and associated bunding, 1 no. oil/water interceptor and percolation area, 1 no. 38kV Transformer bay to include disconnects, circuit breakers, current transformers and cable sealing ends, new containerised medium voltage building and associated works
Carrigoon Beg Mallow
Alterations to existing ESB electrical transformer station to include installation of 2 no. 38kV/MV transformers and associated bunding, 1 no. oil/water interceptor and percolation area, 2 no. 38kV transformer bays to include disconnects, circuit breaker, voltage transformers, current transformers and surge arrestors, new containerised medium voltage buildings and associated civil works
Carrigoon Beg Mallow
The submission window has closed
Observations on this application closed on Monday 11 July 2005, five weeks after it was received. The authority cannot accept a late submission.