Quartertown Ind Estate Quartertown Mallow Co. Cork
NEW APPLICATIONPlanning application 05/55004
Cork - Cork County Council
Proposed Development
Construction of a Civic Amenity Site
Application Timeline
Application received
18 Jan 2005
Decision due
14 Sept 2005
Application Details
- Location
- Quartertown Ind Estate Quartertown Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 January 2005
- Status
- NEW APPLICATION
- Decision
- Pending
- Decision Due
- 14 September 2005
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to accept domestic waste and the installation of associated equipment at Mallow Civic Amenity site
Quartertown Industrial Estate Ballydahin Mallow Co. Cork.
Permission for manufacturing and storage warehouse facility and associated site works
I.D.A. Industrial Estate Quartertown Mallow Co. Cork.
to construct a 2004 sqm two-storey office building with ancillary use and to carry out all associated site works to include on site car parking
I.D.A. Industrial Estate Quartertown Lower Mallow
Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.
Quartertown Ind Est Mallow Co Cork
Change of use of a ground floor office production facility to a training area.
IDA Estate Quartertown Lower Mallow Co. Cork
Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.
Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork
Construction of (1) new fabricating workshop (3200sqm) with attached two-storey office block and canteen area (1028sqm), (2) single storey ESB substation, (3) single storey stainless steel cleaning building, (4) 5X5m overground rainwater storage tank, and (5) all ancillary site works including on-site car park
Mallow Business & Technology Park Quartertown Lower Mallow
proposed development consists of alterations and an extension to the two-storey offices/single storey storage building (building 1), construction of a new single storey storage building (building 6), and associated siteworks (serving buildings 1 & 6)
Quartertown Ind. Estate Mallow Co. Cork.
Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.
Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork
Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.
IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59
The submission window has closed
Observations on this application closed on Monday 21 February 2005, five weeks after it was received. The authority cannot accept a late submission.