IDA Estate Quartertown Lower Mallow Co. Cork
CONDITIONALPlanning application 05/55044
Cork - Cork County Council
Proposed Development
Change of use of a ground floor office production facility to a training area.
Application Timeline
Application received
29 Jun 2005
Decision due
23 Aug 2005
Decision: CONDITIONAL
14 Dec 2005
Grant issued
26 Jan 2006
Application Details
- Location
- IDA Estate Quartertown Lower Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 29 June 2005Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 December 2005
- Grant Date
- 26 January 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.
IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59
Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.
Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork
1) construction of warehouse building 2) extension of existing warehouse building and carrying out of all associated site works
Quartertown Ind Est Quartertown Lower Mallow Co. Cork.
Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road
Quartertown Lower Mallow Co. Cork.
Permission for manufacturing and storage warehouse facility and associated site works
I.D.A. Industrial Estate Quartertown Mallow Co. Cork.
Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.
Quartertown Ind Est Mallow Co Cork
To relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works
Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K
Permission for an additional vehicular entrance & driveway onto the existing industrial estate road to the south side of the existing premises, together with all associated site works.
Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K
Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.
Quartertown Ind Est Mallow Co Cork
Construction of residential development of 6 no. residential units. The proposed development consists of the construction of 6 no. 3 bed semi detached dwellings. Vehicular access is proposed off Clyda Court to the north of the site. Permission is sought for the development outlined including, but not limited to, landscaping, boundary treatments, car parking and all ancillary site development works
off Clyda Court Quartertown Lower Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?