← Back to search

Ball Alley Lane Mallow Co. Cork

CONDITIONAL

Planning application 05/55049

Cork - Cork County Council

Proposed Development

Permission for retention for a ground floor office, permission for planning for 1) the contstruction of a fire exit onto St. James Avenue 2) Alterations to the south elevation and 3)Alteration to the roof changing it from a flat to a pitch roof.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Aug 2005

  2. Decision due

    27 Sept 2005

  3. Decision: CONDITIONAL

    27 Sept 2005

  4. Grant issued

    28 Oct 2005

Application Details

Location
Ball Alley Lane Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 August 2005
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 September 2005
Grant Date
28 October 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

30m
07/55010NEW APPLICATION19 Feb 2007

Carrying out alterations to the rear goods in area of the existing Supervalu premises to include construction of an unloading platform and stairs, alterations to the plant/storage area and elevation changes

Super Valu Davis Street Mallow Co Cork

31m
06/55049NEW APPLICATION21 Jun 2006

1) change of use of existing first,second and third floor areas to 5 no. apartments with new access from Davis Street and changes to existing elevations including raising the height of the existing pitched roof 2) construction of an office and staff area ancillary to the Supermarket use on the existing flat roof at the rear of the premises 3) changes to the existing rear elevation of the Supermarket and construction of unloading areas, plant and refrigeration areas and associated services and storage areas 4) putting in place of ancillary shop signage on the elevations including shop front features on the side elevation 5) modifications to existing car park boundary wall facing onto the public car park

Supervalu, Davis Street and Ball Alley Lane Mallow Co. Cork.

34m
05/55020NEW APPLICATION11 Mar 2005

Permission to refurbish the ground floor retail unit, 2) refurbish and convert the 1st and 2nd floor commercial units to retail and storage use respectively, 3) to replace and restore the 1st and 2 nd floor front windows to their original state and associated site works

No. 125 Davis Street Mallow, Co. Cork.

34m
24/6457CONDITIONAL19 Dec 2024

Permission for the following works: 1) alteration to shop front elevation, and all other associated site works.

Herlihy's Centra Main Street Mallow Co.Cork

34m
18/6167CONDITIONAL16 Aug 2018

The redevelopment, refurbishment and extension of the existing hotel structure facing onto Thomas Davis Street involving a change of use of ground floor from hotel to partial retail use to form a retail unit of 392sq.m (Unit 1) and a partial café/retail use to form a unit of 168sq.m (Unit 2), including ancillary storage and office to the rear. This development involves demolition on ground, first and second floor levels and will include the demolition of single storey function rooms, bars and storage areas, and the construction of an extension to incorporate retail units on ground floor and dwelling units over first and second floor and will include alterations to front, side and rear elevations of the hotel building. The total area to be demolished is approximately 2,287m2. The development involves a change of use of the existing upper floors [first and second floor] from hotel to residential use, with provision of 6 no. (2 bed) dwelling units, with access provided via existing western lane, through ground floor gate, to first floor common area and unit entrances. The development also includes the construction of a retail unit to the rear of the site of 672sq.m (Unit 3) with pedestrian access onto St. James’s Avenue to the east. Vehicular and pedestrian access is to be provided to the rear of the site [south] onto St. James’ Avenue. Pedestrian access from the lane to the west of the site will also be allowed, with a vehicular right of way for the credit union car park from Thomas Davis Street. Permission is sought for 21 no. car parking spaces plus 1 disabled and 1 set down and all associated site services including, but not limited to, plant [roof level], signage, landscaping and drainage etc. all at the Former Central Hotel [Protected Structure].

Former Central Hotel Thomas Davis Streetand St James' Avenue Mallow Co. Cork

34m
18/5796INCOMPLETED APPLICATION10 Jul 2018

The refurbishment of the existing hotel structure facing onto Thomas Davis Street involving a change of use of ground floor from hotel to partial retail use to form a retail unit of 392m2 and to partial café/retail use form a unit of 168sq.m, including ancillary storage and office to the rear. This development involves the demolition of single storey function rooms, bars and storage areas, and alterations to front, side and rear elevations of the hotel building. The total area to be demolished is approximately 2,287sq.m. The development involves a change of use of the existing upper floors [first and second floor] from hotel to residential use, with provision of 6 no. (2 bed) dwelling units, with access provided via existing western lane, through ground floor gate, to first floor common area and unit entrances. The development also includes the construction of a retail unit to the rear of the site of 672sq.m with pedestrian access onto St. James’s Avenue to the east. Vehicular and pedestrian access is to be provided to the rear of the site [south] onto St. James Avenue. Pedestrian access from the lane to the west of the site will also be allowed, with a vehicular right of way for the credit union car park from Thomas Davis Street. Permission is sought for 21 no. car parking spaces plus 1 disabled and 1 set down and all associated site services including, but not limited to, plant [roof level], signage, pedestrian crossing, landscaping and drainage etc. all at the Former Central Hotel [Protected Structure].

Former Central Hotel Thomas Davis Street and Saint James Avenue Mallow Co. Cork

36m
16/5240REFUSED24 May 2016

The change of use of part of existing hotel: change of use of ground floor from hotel to retail use, to form a retail unit of 790m2, including ancillary office and storage, demolition of single storey function rooms, bars and storage areas (977m2), alterations to front, side and rear elevations. Provision of access at ground floor for future access to upper floor [with future use to be determined]. Making secure of upper floors due to previous fire damage and for signage on the front (Thomas Davis Street) elevation. Works are to also include the construction of a two storey retail unit of 761m2, the ground floor area of 561m2 and first floor area of 200m2. This will include retail (ground floor only), ancillary office and storage uses as well as roof level plant and signage to the front (east) elevation. Permission is also sought to extinguish use of existing southern vehicular access and to form new vehicular access arrangement at St James' Avenue [east] and for the provision of 12 car parking spaces and all associated site services at the former Central Hotel, Thomas Davis Street and St James' Avenue, Mallow, being a Protected Structure.

Former Central Hotel Thomas Davis Street St James Avenue,Mallow County Cork

43m
19/4195CONDITIONAL30 Jan 2019

Change of use from consumer electronic retail and related offices and storage to retail butcher, delicatessen, catering kitchen and associated staff facilities, offices and storage. The development will consist of cold rooms and raw meat prep at lower ground floor with revised access from the rear, ground floor commercial catering kitchen, ground floor butcher, grocers and delicatessen. The first floor is to be storage and offices for the business with provision for small public events such as cookery demonstrations. Revisions to the elevations incorporating a new shop front to the laneway for the butchers, new shop front to Main St for the Deli. with a coffee hatch to the laneway for take away service. New windows to the west and skylights to the first floor and new refrigeration and extractor plant placed on the roof accessed by new stairs internally. New signage to both Main Street and the laneway in line with Conservation Area requirements. The existing laneway will be re-surfaced and graded in places to improve drainage and to provide easier access from the lane and to repair damage from construction work. In summary, the existing uses present in the applicants current premises in no. 57 are being re-located to 119.

119 Thomas Davis Street Mallow Co. Cork

45m
18/7253INCOMPLETED APPLICATION11 Dec 2018

Change of use from retail to retail, commercial and delicatessen. The development consists of cold rooms and raw meat prep at lower ground floor with revised access from the rear, ground floor commercial catering kitchen, ground floor butcher, grocers, delicatessen incorporating new shop front to the laneway for the butchers and new shop front to Main Street for the Deli. The first floor is to be storage and offices for the business. In summary, the existing uses present in the applicants current premises in no. 57 are being relocated to 119.

119 Thomas Davis Street/Main Street Mallow Co. Cork

45m
06/55066NEW APPLICATION25 Sept 2006

a)demolition of part of retail premises and adjacent outhouses b) replacing of existing shopfront display area with new shopfront display area and associated signage c) the construction of extension to the rear of existing retail premises - the extension includes basement floor storeage use and ground and first floor retail use

119 Davis Street Mallow Co. Cork.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?