  1. Application received

    10 Feb 2005

  2. Decision due

    11 Jul 2005

  3. Decision: CONDITIONAL

    11 Jul 2005

  4. Grant issued

    16 Aug 2005

Application Details

Location
Inchinashingane Macroom
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 February 2005Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 July 2005
Grant Date
16 August 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

185m
04/2126CONDITIONAL31 Mar 2004

Dwellinghouse

Inchinashingane Macroom

237m
08/7195CONDITIONAL10 Jun 2008

Dwelling and installation of proprietary treatment unit

Inchinashingane Macroom

237m
14/4099UNCONDITIONAL22 Jan 2014

Dwelling and installation of proprietary treatment unit, extension of duration to permission granted under Planning Ref. No. 08/7195

Inchinashingane Macroom Co.Cork

317m
18/4402CONDITIONAL16 Feb 2018

To carry out the following on the site of existing Baby Food Production Facility: (a) Extend 3 no. existing exhaust ducts located on the roof of the M2 drying tower by 10 metres in height together with all necessary support steelworks and access ladders and (b) extend 1 no. existing exhaust duct located on the roof of the M1 drying tower by 10 metres in height together with all necessary support steel work and access ladder. The development relates to an activity in relation to which a revised Integrated Pollution Prevention and Control Licence is required.

Inchinashingane Macroom Co. Cork

333m
24/6317WITHDRAWN5 Dec 2024

Permission to carry out the following on the site of their existing baby food production facility. Permission for (1) Construction of a new hardstanding compound to the north of the existing 38Kva substation. The compound to be secured with 2.9m high palisade fence, (2) Installation of 5MW (5x1MW) of hydrotreated vegetable oil (HVO) stationary standby generators for emergency electricity generation, each generator is enclosed in a weatherproof container (2.8m high x 0.8m Long x 5.0m wide). (3) Installation of 2 no. transformers within the compound and associated cabling. (4) Extension to the existing concrete roadway to access the compound. (5) All associated site works. The development relates to an activity in relation to which a revised Integrated Pollution Prevention and Control Licence is required

Inchinashingane Macroom Co. Cork

335m
11/4463CONDITIONAL9 Mar 2011

[a] Construction of new extension to existing office/administration building including reception area, laboratory, meeting rooms, offices and canteen, [b] construction of high level enclosed walkway between the newly extended office/administration building and the main production facility, [c] extension to existing car parking area, [d] construction of new lorry queuing area, [e] modifications to the existing main entrance including the construction of a separate car park entrance adjacent to the existing entrance gates and all associated site works.

Inchinashingane Macroom

407m
25/6066Grant with Conditions30 Sept 2025

Permission to carry out the following on the lands to the east of their existing baby food production facility. 1) construction of a new hard standing compound. The compound to be secured with 2.9m high palisade fence, 2) installation of 6MW (3x2MW) of Hydrotreated vegetable oil (HVO) stationary standby generators for emergency electricity generation, each generator is enclosed in a weatherproof container (3.710m high x 14.6m long x 3.65m wide), 3) installation of 3 no. transformers within the compound and associated cabling, 4) installation of 2 no. bunded fuel storage tanks (5.15m long x 2.3m wide x 2.4m high), 5) extension to the existing western concrete roadway within the Nutricia site to access the compound, 6) All associated site works and interconnecting underground cabling. The electricity generated will be used by the Nutricia Infant Nutrition site, during times of interrupted electrical supply from the national grid. Nutricia Infant Nutrition currently operates under an Integrated Pollution, Prevention and Control Licence

Inchinashingane, Macroom, Cork, P12XW40

450m
26/1176Awaiting F.I. Response6 May 2026

We, PMCG Consulting Engineers & Project Management Ltd 77 Main Street Macroom (026 24123) on behalf of Danone Infant Nutrition Macroom Ltd, intend to apply for Planning permission for the Construction of an Advanced Medical Nutrition (AMN) Production Facility and all associated site works on the site of their existing manufacturing facility at Inchinashingane, Macroom, Co. Cork The Development will consist of: a An Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application, and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The development relates to an activity in relation to which a revised Industrial Emissions Licence is required.

Inchinashingane, Macroom, Co. Cork

457m
15/4762UNCONDITIONAL16 Apr 2015

Construction of a new combined heat and power plant and ancillary services on the site of existing milk processing and baby food production facility, extension of duration to permission granted under Planning Ref. No. 10/4149

Inchinashingane Macroom Co.Cork

539m
22/5922CONDITIONAL22 Aug 2022

(1) Upgrade works to the existing waste water treatment plant consisting of the following: (a) Construct a 2,105m3 concrete anoxic tank (24.4m dia. x 5m high). The base of the tank is to be located at 3m below the existing ground level, (b) Install additional aeration system to the oxidation ditch, (c) Realignment of part of the existing berm to facilitate the upgrade works, (d) modifications to existing underground pipework to integrate the modification works into the existing waste water treatment plant and (e) associated site works. The development relates to an activity in relation to which a revised integrated pollution, prevention and control licence is required.

Inchinashingane Macroom Co.Cork