← Back to search

Ballynacubby Kinsale

CONDITIONAL

Planning application 05/7843

Cork - Cork County Council

Proposed Development

Construction of two storey nursing home (comprising of 50 beds, treatment rooms, common room, catering, laundry facilities, oratory, doctors surgery, basement parking and ancillary spaces), construction of 41 no. sheltered apartment units (comprising of three storey block of 15 no. apartments, two storey block of 8 no. apartments and two storey block of 18 no. apartments), car parking and associated site works including temporary sewerage treatment works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Oct 2005

  2. Decision due

    19 Feb 2006

  3. Decision: CONDITIONAL

    20 Feb 2006

  4. Grant issued

    28 Mar 2006

Application Details

Location
Ballynacubby Kinsale
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
26 October 2005
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 February 2006
Grant Date
28 March 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
15/4835CONDITIONAL23 Apr 2015

Extensions to existing nursing home building including a link extension at first floor level to apartment block A, alterations and change of use at 1st floor level of apartment block A of 5 no. apartments to 14 no. bedrooms and extension of apartment block A at eastern gable attaching to existing apartment block B and associated site works. Permission is also sought for retention of the existing nursing home building as constructed (change of design and layout from that permitted under Planning Ref. No. 05/7843), retention of minor elevational and internal alterations and minor repositioning of apartment blocks A & B, alterations to site boundaries to those permitted under Planning Ref. No. 05/7843 and associated site works and services including bin storage areas, landscaping and car parking

Haven Bay Nursing Home Ballynacubby Kinsale

6m
15/4484INCOMPLETED APPLICATION12 Mar 2015

Retention of existing nursing home rooms at basement level - floor area 694m². Retention of minor overal elevational changes to buildings from original permission - site area 1.1 hectares. Proposed extensions of 2,001m² to nursing home and conversion of five existing apartments to fourteen nursing home bedrooms and associated site works

Haven Bay Nursing Home Ballynacubby Kinsale

84m
15/6550INCOMPLETED APPLICATION13 Nov 2015

Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) Site Nos. 1 to 3 inclusive located at the entrance, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the curtilage of site No. 3, and (B) site Nos. 4 & 5 located to the north-west of the said estate, together with all associated services (reduction in density and change of site layout from previously planning ref: 05/4093)

The Orchards Ballynacubby Kinsale Co. Cork

84m
15/6681CONDITIONAL26 Nov 2015

Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) Site Nos. 1 - 3 inclusive located at the entrance to "The Orchards" Estate, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the curtilage of site No. 3, and (B) site Nos. 4 & 5 located to the north-west of the said Estate, together with all associated services (reduction in density and change of site layout from previous Planning Reg. No. 05/4093)

"The Orchards" Ballynacubby Kinsale Co. Cork

90m
05/4093CONDITIONAL10 Jun 2005

87 no. dwelling units comprising of 77 no. dwellinghouses and 10 no. apartments, creche, medical surgery, shop unit and reconfiguration of access from Eltins Wood and associated site works

Ballynacubby Kinsale

90m
18/5121CONDITIONAL4 May 2018

1. Construct a new ‘one and a half’ storey dwelling house with an attached garage, utility room/studio and a stand-alone garden store, 2. Connect to the local area mains sewage system, 3. Carry out all associated site works.

The Orchards Estate Ballynacubby Kinsale Co. Cork

94m
14/5306CONDITIONAL19 Jun 2014

Construction of a ground floor extension to apartment

49 The Orchards Ballynacubby Kinsale Co.Cork

96m
15/6356INCOMPLETED APPLICATION21 Oct 2015

Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) site No’s 1-3 inclusive located at the entrance to ‘The Orchards’ estate, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the cartilage of site No.3, and (B) site No’s 4 & 5 located to the north-west of said estate, together with all associated services (reduction in density and change of site lay-out parent planning ref: 05/4093)

'The Orchards' Ballynacubby Kinsale Co. Cork

106m
18/5920CONDITIONAL20 Jul 2018

The construction of a new dwellinghouse, connection to mains sewage system, and all ancillary works.

The Orchards Estate Ballynacubby Kinsale Co. Cork

111m
18/6262CONDITIONAL28 Aug 2018

Construction of a two storey dwellinghouse

Site No. 1 at entrance to 'The Orchards' Ballynacubby Kinsale Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?