Haven Bay Nursing Home Ballynacubby Kinsale
INCOMPLETED APPLICATIONPlanning application 15/4484
Cork - Cork County Council
Proposed Development
Retention of existing nursing home rooms at basement level - floor area 694m². Retention of minor overal elevational changes to buildings from original permission - site area 1.1 hectares. Proposed extensions of 2,001m² to nursing home and conversion of five existing apartments to fourteen nursing home bedrooms and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
12 Mar 2015
Decision due
6 May 2015
Application Details
- Location
- Haven Bay Nursing Home Ballynacubby Kinsale
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 March 2015
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 6 May 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extensions to existing nursing home building including a link extension at first floor level to apartment block A, alterations and change of use at 1st floor level of apartment block A of 5 no. apartments to 14 no. bedrooms and extension of apartment block A at eastern gable attaching to existing apartment block B and associated site works. Permission is also sought for retention of the existing nursing home building as constructed (change of design and layout from that permitted under Planning Ref. No. 05/7843), retention of minor elevational and internal alterations and minor repositioning of apartment blocks A & B, alterations to site boundaries to those permitted under Planning Ref. No. 05/7843 and associated site works and services including bin storage areas, landscaping and car parking
Haven Bay Nursing Home Ballynacubby Kinsale
Construction of two storey nursing home (comprising of 50 beds, treatment rooms, common room, catering, laundry facilities, oratory, doctors surgery, basement parking and ancillary spaces), construction of 41 no. sheltered apartment units (comprising of three storey block of 15 no. apartments, two storey block of 8 no. apartments and two storey block of 18 no. apartments), car parking and associated site works including temporary sewerage treatment works
Ballynacubby Kinsale
Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) Site Nos. 1 to 3 inclusive located at the entrance, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the curtilage of site No. 3, and (B) site Nos. 4 & 5 located to the north-west of the said estate, together with all associated services (reduction in density and change of site layout from previously planning ref: 05/4093)
The Orchards Ballynacubby Kinsale Co. Cork
Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) Site Nos. 1 - 3 inclusive located at the entrance to "The Orchards" Estate, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the curtilage of site No. 3, and (B) site Nos. 4 & 5 located to the north-west of the said Estate, together with all associated services (reduction in density and change of site layout from previous Planning Reg. No. 05/4093)
"The Orchards" Ballynacubby Kinsale Co. Cork
Construction of a ground floor extension to apartment
49 The Orchards Ballynacubby Kinsale Co.Cork
87 no. dwelling units comprising of 77 no. dwellinghouses and 10 no. apartments, creche, medical surgery, shop unit and reconfiguration of access from Eltins Wood and associated site works
Ballynacubby Kinsale
1. Construct a new ‘one and a half’ storey dwelling house with an attached garage, utility room/studio and a stand-alone garden store, 2. Connect to the local area mains sewage system, 3. Carry out all associated site works.
The Orchards Estate Ballynacubby Kinsale Co. Cork
Site development works for 5 no. detached dwellings and 1 no. ancillary commercial unit: (A) site No’s 1-3 inclusive located at the entrance to ‘The Orchards’ estate, incorporating ancillary detached commercial unit (future crèche/surgery or similar use) within the cartilage of site No.3, and (B) site No’s 4 & 5 located to the north-west of said estate, together with all associated services (reduction in density and change of site lay-out parent planning ref: 05/4093)
'The Orchards' Ballynacubby Kinsale Co. Cork
The construction of a new dwellinghouse, connection to mains sewage system, and all ancillary works.
The Orchards Estate Ballynacubby Kinsale Co. Cork
Construction of a two storey dwellinghouse
Site No. 1 at entrance to 'The Orchards' Ballynacubby Kinsale Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?