Proposed Development
Dwellinghouse and garage
View the full application file on the council's planning portal →Application Timeline
Application received
28 Oct 2005
Decision: REFUSED
20 Dec 2005
Decision due
22 Dec 2005
Application Details
- Location
- Littlesilver Bandon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 October 2005
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 20 December 2005
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the proposed demolitions , extensions and alterations to an existing dwelling, and all associated site works
Littlesilver Bandon Co.Cork
Demolition of existing conservatory and construction of single storey extension with refurbishments to existing dwelling and all associated works
Millwood Littlesilver Bandon Co.Cork
Permission for retention of installation of septic tank and percolation area and permission for retention of domestic storage shed and associated siteworks.
Littlesilver Bandon Co. Cork
Permission for retention of a single storey steel framed shed, concrete & stone hard standing area and associated site works for purpose of vintage vehicle/machinery storage.
Littlesilver Bandon co.Cork
Permission for the construction of proposed single storey steel framed shed and associated site works for the purpose of vintage vehicle and vintage machinery storage at the rear of existing dwelling.
Littlesilver Bandon Co. Cork P72 YV97
Permission for the construction of a single storey steel framed shed and associated site works for the purpose of vintage vehicle and machinery storage, all at the rear of existing dwelling.
Littlesilver, Bandon, Co. Cork, P72YV97
EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development at this site of c. 1.29 ha, located on lands at Littlesilver, Bandon, Co. Cork. The proposed development consists of a battery energy storage system (BESS) facility, which will comprise of rechargeable battery units contained within 28 no. c. 25 ft containers on site; 7 no. MVs units; 1 no. auxiliary transformer; a resistor, reactor and harmonic filter unit; a low voltage (LV) building and a welfare and spares container. The proposed development also involves the diversion of the existing overhead line on site and includes an underground cable, which will connect the BESS facility to the Bandon 110kV substation. The proposed development will include for the demolition and removal of the existing decommissioned wind turbine and associated outbuilding on site. The proposed development also includes the construction of a 38kV substation building with associated compounds and car parking; stock proof fencing and gateways; landscaping; foul water holding tank; rainwater harvesting tank; stone soakaways; piped infrastructure and ducting; retention basin and stone headwall; signage; security fencing; boundary treatments; lighting; CCTV; SUDs; permeable gravel area; upgrading of the existing site entrance with partial hedgerow removal; new access track and upgrading of the existing access track; and all associated site development and excavation works above and below ground. Planning permission is sought for a period of 10 years.
Littlesilver,, Bandon, Co. Cork
Dwellinghouse & wastewater treatment unit
Mishells Bandon
Dwellinghouse and installation of wastewater treatment unit
Mishells Bandon
Dwelling and garage
Callatrim Bandon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?