Proposed Development
Storage yard for storage of commercial vehicles and asociated works
View the full application file on the council's planning portal →Application Timeline
Application received
10 Nov 2005
Decision due
13 Jan 2006
Decision: REFUSED
13 Jan 2006
Application Details
- Location
- Caherdowney Millstreet
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 10 November 2005
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 13 January 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Storage yard for commercial vehicles and associated works
Caherdowney Millstreet
Renovations, alterations and extension to dwellinghouse, construction of garage and installation of treatment unit
Caherdowney Millstreet
Construction of a battery storage compound including 2 no. battery storage buildings with associated plant and equipment, an ancillary 110kV electricity substation with 2 no. control buildings, associated electrical plant & equipment and fencing, underground electricity cabling, surface water drainage, site entrance and access track, security fencing and all ancillary site works. Extension of Duration to Permission granted under Planning Ref. No. 18/5686
Caherdowney Millstreet Co.Cork
Construction of a battery storage compound including 2 no. battery storage buildings with associated plant and equipment, an ancillary 110kV electricity substation with 2 no. control buildings, associated electrical plant & equipment and fencing, underground electricity cabling, surface water drainage, site entrance and access track, security fencing and all ancillary site works.
Caherdowney Millstreet Co. Cork
Sheep house, silage base and effluent tank
Caherdowney Millstreet
The proposed development will comprise the construction of one (1) no. ± 100 Mvar STATCOM transformer, one (1) no. auxiliary transformer, three (3) no. reactors, one (1) no. outdoor cooling bank, control and valve building (268m²), underground connection to existing ESB substation. It further includes security fencing, security gate, four (4) no. 25m high lightning masts, permeable surfacing, and an internal access road. There will also be the construction of one (1) no. temporary contractors' compound. The development is an extension to the existing substation and the overall site area (within the planning application boundary) is 0.73ha. Access is provided via a local road (L5226) onto the R582.
Caherdowney Millstreet
Proposed modifications to the previously permitted development (planning ref: 18/06438 granted on 7th March 2019).The proposed modifications will comprise the additional construction of one (1) harmonic filter, one (1) HV circuit breaker (including CT and VT), one (1) MV disconnector and earth switch, two (2) cable sealing ends, three (3) additional lightning masts (approximately 25m high) and additional lamppost lightning. It further includes a retaining wall (approximately 2.5m high), asphalt (non-permeable) surfacing, additional permanent access road, additional fencing to match existing 2.6m high palisade, additional permanent access gate and all other ancillary site development works. The development will remain an extension to the existing substation and this extension will have an overall site area (within the planning application boundary) of 0.73ha. Access will continue to be provided via a L5226 and the R582.
Existing ESB Ballyvouskill 220/110 kV substation Located in the townland of Caherdowney Millstreet, Co. Cork
Proposed modification to the previously permitted development ( planning ref: 18/06438 granted on 7th March 2019) The proposed modifications will comprise the additional construction of one (1) harmonic filter, one (1) HV circuit breaker (including CT and VT), one (1) MV disconnector and earth switch, two (2) cable sealing ends, three (3) additional lighting masts (approximately 25m high) and additional lamppost lightning. It further includes a retaining wall approximately 2.5m high), asphalt (non-permeable) surfacing, additional permanent access road, additional fencing to match existing 2.6m high palisade, additional permanent access gate and all other ancillary site development works. The development will remain an extension to the existing substation and this extension will have an overall site area (within the planning application boundary) of 0.73ha. Access will continue to be provided via a L5226 and the R582.
The exisiting ESB Ballyvouskill 220/110 kV substat located in the townland of Caherdowney Millstreet Co. Cork
Construction of sheep dipping, penning and handling unit
Ballyvouskill Millstreet
Construction of sheep dipping, penning and handling unit
Ballyvouskill Millstreet
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?