Application Details
- Location
- Ballyhank Waterfall
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 November 2005
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct a detached single storey garage.
Knockpoge Waterfall Co. Cork
Dwelling
Knockpoge Waterfall
Dwellinghouse
Ballyhank Waterfall
Dwellinghouse and garage
Knockpoge Waterfall
Dwellinghouse and garage
Knockpoge Waterfall
Dwellinghouse
Ballyhank Waterfall
Dwellinghouse
Ballyhank Waterfall
2 no. pre-fabricated buildings for use as office and canteen and toilet
Knockpoge Waterfall
Retention of the following structures/facilities: (a) Waste and recovery station building (change of plan from that permitted under planning reg. no. 01/384), (b) Prefabricated structures - office, canteen, toilet, tool store and hut for CCTV camera, (c) Workshop for servicing vehicles, (d) Open area (adjoining the western gable of the waste transfer building) containing plant/equipment (soil/stone separator), (e) Truck wash and bunded fuel tank and (f) Temporary facility for trucks, skips, cars, etc.
Knockpoge Waterfall Co Cork
Retention of the following structures/facilities: [a] material change in the construction of waste transfer station to structure permitted under planning reg. no. 01/384, [b] pre-fabricated structures - offices, canteen, toilet, tool store and hut for CCTV camera, [c] workshop for servicing vehicles, [d] open area (adjoining the western gable of the waste transfer building) containing plant/equipment (soil/stone separator) and [e] temporary facility for trucks, skips, cars etc. (the application relates to development which si for the purposes of an activity requiring a waste licence)
Knockpoge Waterfall
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?