← Back to search

Lackenafasoge Bantry

INCOMPLETED APPLICATION

Planning application 05/9038

Cork - Cork County Council

Proposed Development

Modification to windfarm permitted under 02/3281 to include increase in turbine size from 86m tip height to 100m tip height, reduction in no. of turbines from 21no. to 13 no. with subsequent modification of site tracks layout and upgrade of existing site entrances and ancillary structures

View the full application file on the council's planning portal →

Application Details

Location
Lackenafasoge Bantry
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
7 December 2005
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
05/9586CONDITIONAL21 Dec 2005

Wind farm to consist of 13 no. wind turbines with blade tip height of up to 100m, electrical substation and control building, 60m high meteorological mast, site entrances, access tracks, hardstandings and ancillary site works

Dromoureen Bantry

0m
02/3281CONDITIONAL24 Jul 2002

Windfarm consisting of 21 no. turbines, 60m high met mast, substation and control building, site tracks and entrances

DROMOURNEEN, DROMOURNEEN,

462m
16/6CONDITIONAL6 Jan 2016

The upgrade of the existing site entrance at Derreennacno and amendment of Condition 1 of An Bord Pleanala Reference PL 04.216875 (a permission for 13 no. turbines) to specify that the structures should be removed at the expiration of a 25 year period instead of the 20 years permitted. Permission is also sought for the amendment of Condition 4 of An Bord Pleanala Reference PL 88. 235028, (a permission for 6 no. turbines) to specify that the permission is for a period of 25 years from the date of commissioning instead of the 20 years specified in the condition. An environmental impact statement (EIS) has been prepared and will be submitted to the planning authority with this application

Townlands of Lognagappul, Lackenafasoge, Glanaphuca-Caheragh Drimoleague, and Townlands of Dromourneen,Derreennacno and Barryroe-Bantry-Glanta Commons Wind Farm

539m
02/3280CONDITIONAL24 Jul 2002

Erection of 40m high wind monitoring mast

DROMOURNEEN, DROMOURNEEN,

580m
04/2211CONDITIONAL2 Apr 2004

Relocation of substation and provision of site tracks in relation to grant of planning W/02/3281

Dromourneen Bantry

671m
18/743CONDITIONAL5 Dec 2018

Planning retention for domestic garage, with domestic storage overhead, & all associated site works

Dromourneen Caheragh Bantry Co. Cork

708m
06/245CONDITIONAL17 Feb 2006

Dwellinghouse & associated site works

Dromourneen Bantry

1.1km
09/849CONDITIONAL27 Jul 2009

Ten year planning permission for a wind farm of up to 6 wind turbines (hub height 64m and rotor diameter of 71m - tip height of 99.5m), access roads, hardstandings, underground cabling, rock borrow pit and ancillary site works - forming an extension to the existing Glanta Commons Windfarm

Dromourneen, Lognagappul & Barryroe Bantry Co. Cork

1.1km
00/4784NEW APPLICATION4 Aug 2000

Dwelling

DERREENNACNO, DERREENNACNO,

1.1km
20/724CONDITIONAL11 Dec 2020

Permission for retention of the following to dwelling house: (i) extensions to side and rear of dwelling-house, (ii) installation of solar panels to gable end of house, and (iii) associated site works

Derreennacno Bantry Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?