Application Timeline

  1. Application received

    14 Sept 2006

  2. Decision: CONDITIONAL

    20 Dec 2006

  3. Decision due

    21 Dec 2006

  4. Grant issued

    30 Jan 2007

Application Details

Location
Barnahely Ringaskiddy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
14 September 2006
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 December 2006
Grant Date
30 January 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
03/403CONDITIONAL5 Feb 2003

Retention of 2 no. temporary prefabricated extensions to existing facility for use as offices and engineering laboratory

BARNAHELY, BARNAHELY,

12m
26/0424Grant with Conditions20 Feb 2026

Permission for 1 No. prefabricated single storey building for manufacturing installed to the north east of the site and with link corridors to be provided from proposed building to existing buildings, Planning Permission for Retention for 4 no. single storey prefabricated buildings uses as following: No.1 Circuit Board Testing ( Previously permitted under 03/403, No.2 Locker room, No.3 Storage and No. 4 Office/Training Room (Previously permitted under 06/10613), all with links to main building and Retention of extension to existing carpark with 34 additional parking spaces and all associated site works.

Barnahely, Ringaskiddy, Co. Cork, P43HD42

12m
26/0054Invalid - Case Closed14 Jan 2026

Permission for 1 no. prefabricated single storey building for manufacturing installed to the north east of the site and with link corridors to be provided from proposed building to existing buildings, planning permission for retention for 4 no. single storey prefabricated buildings uses as follows; no.1 circuit board testing (previously permitted under 03/403), no. 2 locker room, no.3 storage and no. 4 office/training room (previously permitted under 06/10613), all with links to main building and retention of extension to existing carpark with 34 additional parking spaces and all associated site works

Barnahely, Ringaskiddy, Carrigaline, Cork, P43HD42

53m
20/5565CONDITIONAL23 Jul 2020

Demolition / removal of the existing prefabricated laboratory and engineers office buildings and construction of a 2-storey replacement building consisting of a laboratory on the ground floor and office on the first floor with ancillary staff facilities, pedestrian link extension to existing North Building Circuit Card Assembly and Offices, delivery yard, minor widening of Marsh Road and existing vehicle entrance to the east and all associated site works.

Barnahely Ringaskiddy Co. Cork

53m
20/5361INCOMPLETED APPLICATION1 Jul 2020

Demolition / removal of the existing prefabricated laboratory and engineers office buildings and construction of a 2 storey replacement building consisting of a laboratory on the ground floor and office on the first floor with ancillary staff facilities, pedestrian link extension to existing North Building Circuit Card Assembly and Offices, delivery yard, minor widening of Marsh Road and existing vehicle entrance to the east and all associated site works.

Barnahely Ringaskiddy Co. Cork

253m
16/5658CONDITIONAL5 Jul 2016

Development at this site of c.8.98 ha at Barnahely, Ringaskiddy, Co. Cork. The proposed development seeks to provide site development works for future industrial development including site excavation, regrading of existing levels, undergrounding of existing electrical cables, landscaping and boundary treatment works. The proposed development also makes provision for a temporary construction access from the adjacent public road and a temporary perimeter surface water drainage system.

Barnahely Ringaskiddy Co. Cork

287m
16/6365CONDITIONAL23 Sept 2016

A BioPark and all ancillary site development works including landscaping, fencing and signage. The proposed BioPark consists of 4 no. 2-storey bio-manufacturing buildings, 4 no. 2-storey administration/laboratory buildings with roof top plant room, a 2 storey warehouse building with 6 storey storage tower, a 2 storey hydration facility building, a 2 storey central utilities building with external boiler flues, and a 2 storey canteen and administration building with roof top plant room and service yard. The bio-manufacturing, administration/laboratory, hydration facility and central utilities buildings are all connected to the central warehouse building via 2 no. 1-2 storey spine buildings. The proposed site development works include a security building, pump house, water chiller tower, the relocation of overhead wires, 4 no. generators, ESB compound, water balancing tank farm, fire water tank, utility water tank, Bord Gais compound, internal access roads, car parking and a fire water retention pond. Primary access to the proposed development is from the R613 with a secondary access via an existing entrance from the L2496.

Barnahely Raheens East Ringaskiddy Co. Cork

342m
21/5480CONDITIONAL27 May 2021

The construction of a warehouse building for storage, distribution and manufacturing, with ancillary 2-storey offices, staff facilities, parking, entrance off existing public road and all associated site works.

Barnahely Ringaskiddy Co. Cork

343m
07/11936REFUSED25 Oct 2007

Erection of 25m support pole carrying 3 no. 2.8m radio aerials for use by The Emergency Services with associated equipment for new National Digital Radio Service

Eircom Exchange Barnahely Ringaskiddy

397m
14/4676CONDITIONAL3 Apr 2014

Relocation of existing stone boundary wall on IDA property adjacent to the access road to the Janssen Biologics manufacturing facility and re-grading of the embankment between the new wall location and the R613 roadway to provide enhanced sightlines for the access road to the facility

Barnahely Ringaskiddy Co.Cork

Planning a project of your own?