Application Details
- Location
- Cullenagh Kealkil
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 February 2006
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of existing dwelling house and adjacent shed, construction of dwelling house, garage, sauna room and all associated site works
Cullenagh Kealkill
Demolition of existing dwelling house, adjacent shed and for construction of a dwelling house, separate garage, separate sauna room and all assocuated site works
Cullenagh Kealkill
Demolition of existing dwelling house, adjacent shed and construction of a dwelling house, separate garage, separate sauna and all associated site works
Cullenagh Kealkill Co. Cork
Renovation of ruinous dwelling to incorporate conversion and renovation of nearby outbuilding and construction of interconnection extensions to form single dwellinghouse; Development will include: (i) raise and reconstruction of roof of ruinous dwelling and change of fenestration of same, (ii) raise of roof level of outbuilding and change of fenestration of same, (iii) construction of 2no. extensions to interconnect outbuilding and ruinous dwelling, (iv) installation of new percolation area for existing septic tank and (v) all associated site works
Cullenagh Kealkill Bantry
Construction of two storey extension to dwellinghouse
CURRAGLASS, CURRAGLASS,
Dwellinghouse, detached domestic garage and all associated site works
Curraglass Kealkill
Dwellinghouse and detached garage
Curraglass Kealkill Bantry
Construction of dwelling house, and dometic garage and all associated site works
Curraglass Kealkill Co. Cork
Construction of dwelling house and all associated site works
Curraglass Kealkill Co. Cork
A ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning) and will consist of the following i. Up to 7 no. wind turbines with an overall blade tip height of up to 178.5 metres and all associated foundations and hard-standing areas; ii 2 no. borrow pits; iii 1 No. permanent meteorological mast with a maximum height of up to 112 metres; iv. Upgrade of existing and provision of new site access roads; v. Upgrade to existing access junction; vi. A 38kV electricity substation, including 4 no. battery storage containers, 1 no. control building with welfare facilities, associated electrical plant and equipment, security fencing, and waste water holding tank; vii. Forestry Felling; viii. A temporary construction compound; ix. Site Drainage; x. All associated internal underground cabling, including underground grid connection cabling to the existing overhead line; and xi. All associated site development and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been prepared in relation to the proposed development and accompanies this planning application
Derreendonee, Curraglass and Cappaboy Beg Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?