Derreendonee, Curraglass and Cappaboy Beg Co. Cork
RefusedPlanning application 20/350
Cork - Cork County Council
Proposed Development
A ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning) and will consist of the following i. Up to 7 no. wind turbines with an overall blade tip height of up to 178.5 metres and all associated foundations and hard-standing areas; ii 2 no. borrow pits; iii 1 No. permanent meteorological mast with a maximum height of up to 112 metres; iv. Upgrade of existing and provision of new site access roads; v. Upgrade to existing access junction; vi. A 38kV electricity substation, including 4 no. battery storage containers, 1 no. control building with welfare facilities, associated electrical plant and equipment, security fencing, and waste water holding tank; vii. Forestry Felling; viii. A temporary construction compound; ix. Site Drainage; x. All associated internal underground cabling, including underground grid connection cabling to the existing overhead line; and xi. All associated site development and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been prepared in relation to the proposed development and accompanies this planning application
View the full application file on the council's planning portal →Application Timeline
Application received
6 Jul 2020
Decision: Refused
26 Aug 2020
Decision due
27 Aug 2020
Application Details
- Location
- Derreendonee, Curraglass and Cappaboy Beg Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 6 July 2020
- Status
- Application Closed
- Decision
- Refused
- Decision Date
- 26 August 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for a period of 10 years for development of this site. The proposed development will consist of the provision of the following: I. 3 no. wind turbines with an overall turbine tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use of the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mast with a height of 30 metres above ground and associated foundation and hard-standing area; IV. All associated underground electrical and communications cabling connecting the wind turbines and meteorological mast to the existing onsite 38kV substation; V. A temporary construction compound (including 2 no. site offices and staff facilities (with a combined floor area of 60 sq.m); VI. A borrow pit; VII. Peat and spoil management; VIII. Upgrade of existing site tracks / roads and provision of new site access roads, junctions and hardstand areas; IX. Temporary improvements and modifications to the existing site access junction off the R584 to facilitate delivery of turbine components; X. Upgrade of an existing access track off the R584, including temporary improvements and modifications to facilitate a turbine component turning area; XI. Tree Felling and Vegetation Removal; XII. Biodiversity Enhancement measures (Kerry Slug habitat enhancement, peatland habitat enhancement, and riparian planting of native broadleaf trees); XIII. Site Drainage; XIV. Operational stage site signage; and XV. All associated site development works, ancillary works and apparatus. A 35-year operational life from the date of the full commissioning of the wind turbines and subsequent decommissioning of the development is being sought. An Environmental Impact Assessment Report (EIAR) and Naura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. Cead a iarraidh ar feadh tréimhse 10 mbliana, chun an suíomh seo a fhorbairt sna bailte fearainn Doirín Dún Aodha, An Currach Glas, An Cheapach Bhuí Bheag, agus An Inse Mhór, Co. Chorcaí. Cuimseofar na nithe seo leanas san bhForbairt Bearthaithe; I. 3 thuirbín gaoithe le huasairde barr tuirbín de 156.5 méadar; trastomhas lann rótair de 133 méadar; agus airde moil de 90 méadar, agus na boinn, na limistéir chrua-sheasta agus na limistéir tionóil ghaolmhara; II. Úsáid leanúnach an fhostáisiúin 38kV atá ar an Suíomh cheana féin agus an cháblaíocht faoi thalamh 38kV gaolmhar (tógtha faoi Uimhir Thagartha Chomhairle Contae Chorcaí 00/6590 / Uimhir Thagartha an Choimisiúin Phleanála 04.127297); III. Crann meitéareolaíochta atá 30 méadar ar airde os cionn na talún agus an bunús agus an limistéar crua-sheasta gaolmhar; IV. An cháblaíocht leictreach agus cumarsáide faoi thalamh gaolmhar go léir a nascann na tuirbíní gaoithe agus an crann meitéareolaíochta leis an bhfostáisiún 38kV atá ann cheana féin ar an Suíomh; V. Compún tógála sealadach (lena n-áirítear 2 oifig suímh agus áiseanna foirne, (le hachar urláir comhcheangailte de 60 méadar cearnach); VI. Sloc iasachta; VII. Bainistiú móna agus cartadh; VIII. Uasghrádú ar rianta/bóithre suímh atá ann cheana féin, agus soláthar bóithre rochtana suímh nua, acomhail agus limistéir chrua-sheasta; IX. Feabhsuithe agus modhnuithe sealadacha ar an acomhal rochtana suímh atá ann cheana féin amach ón R584 chun seachadadh ualaí neamhghnácha a éascú; X. Uashghrádú ar an mbóthar rochtana atá ann cheana féin amach ón R584, lena n-áiritear feabhsuithe agus modhnuithe chun limistéar casadh comhpháirteanna tuirbíne a éascú; XI. Leagan Crann agus Baint Fásra; XII Bearta Feabhsúcháin Bithéagsúlachta (feabhsú gnáthóige drúchtín ballach, feabhsú gnáthóige portaigh, agus plandáil crainn dhúchasacha leathanduilleacha bruachánach); XIII. Draenáil Suímh; XIV. Comharthaíocht ar s
Wingleaf Limited, Derreendonee, Curraglass,, Cappaboy Beg and Inchi More, Co. Cork
Permission for a period of 10 years for development of this site. The proposed development will consist of the with an overall turbine tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use o f the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mast with a height of 30 metres above ground and associated foundation and hard-standing area; IV. All associated underground electrical and communications cabling connecting the wind turbines and meteorological mast to the existing onsite 38kV substation; V. A temporary construction compound (including 2 no. site offices and staff facilities (with a combined floor area of 60 sq.m); VI. A borrow pit; VII. Peat and spoil management; VIII. Upgrade of existing site tracks / roads and provision of new site access roads, junctions and hardstand areas; IX. Temporary improvements and modifications to the existing site access junction off the R584 to facilitate delivery of turbine components; X. Upgrade of an existing access track off the R584, including temporary improvements and modifications to facilitate a turbine component turning area; XI. Tree Felling and Vegetation Removal; XII. Biodiversity Enhancement measures (Kerry Slug habitat enhancement, peatland habitat enhancement, and riparian planting of native broadleaf trees); XIII. Site drainage; XIV. Operational stage site signage; and XV. All associated site development works, ancillary works and apparatus. A 35-year operational life from the date of the full commissioning of the wind turbines and subsequent decommissioning of the development is being sought. An Environmental Impact Assessment Report (EIAR) and Naura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. Cead a iarraidh ar feadh tréimhse 10 mbliana, chun an suíomh seo a fhorbairt sna bailte fearainn Doirín Dún Aodha, An Currach Glas, An Cheapach Bhuí Bheag, agus An Inse Mhór, Co. Chorcaí. Cuimseofar na nithe seo leanas san bhForbairt Bearthaithe; I. 3 thuirbín gaoithe le huasairde barr tuirbín de 156.5 méadar; trastomhas lann rótair de 133 méadar; agus airde moil de 90 méadar, agus na boinn, na limistéir chrua-sheasta agus na limistéir tionóil ghaolmhara; II. Úsáid leanúnach an fhostáisiúin 38kV atá ar an Suíomh cheana féin agus an cháblaíocht faoi thalamh 38kV gaolmhar (tógtha faoi Uimhir Thagartha Chomhairle Contae Chorcaí 00/6590 / Uimhir Thagartha an Choimisiúin Phleanála 04.127297); III. Crann meitéareolaíochta atá 30 méadar ar airde os cionn na talún agus an bunús agus an limistéar crua-sheasta gaolmhar; IV. An cháblaíocht leictreach agus cumarsáide faoi thalamh gaolmhar go léir a nascann na tuirbíní gaoithe agus an crann meitéareolaíochta leis an bhfostáisiún 38kV atá ann cheana féin ar an Suíomh; V. Compún tógála sealadach (lena n-áirítear 2 oifig suímh agus áiseanna foirne, (le hachar urláir comhcheangailte de 60 méadar cearnach); VI. Sloc iasachta; VII. Bainistiú móna agus cartadh; VIII. Uasghrádú ar rianta/bóithre suímh atá ann cheana féin, agus soláthar bóithre rochtana suímh nua, acomhail agus limistéir chrua-sheasta; IX. Feabhsuithe agus modhnuithe sealadacha ar an acomhal rochtana suímh atá ann cheana féin amach ón R584 chun seachadadh ualaí neamhghnácha a éascú; X. Uashghrádú ar an mbóthar rochtana atá ann cheana féin amach ón R584, lena n-áiritear feabhsuithe agus modhnuithe chun limistéar casadh comhpháirteanna tuirbíne a éascú; XI. Leagan Crann agus Baint Fásra; XII Bearta Feabhsúcháin Bithéagsúlachta (feabhsú gnáthóige drúchtín ballach, feabhsú gnáthóige portaigh, agus plandáil crainn dhúchasacha leathanduilleacha bruachánach); XIII. Draenáil Suímh; XIV. Comharthaíocht ar shuIomh na céime oibríochta; agus XV. Gach obair
Wingleaf Limited, Derreendonee, Curraglass,, Cappaboy Beg and Inchi More, Co. Cork
Modifications to a previously permitted 10 no. turbine windfarm to include increase in hub height from 47m to 65m, increase in blade tip height from 75m to 91m and the movement of a number of turbines to new locations
Cappaboy beg Curraglass Kealkil
Windfarm to include 10 no. turbines, 2 no. meteorological masts, substation with control building,site tracks,upgrading of site access & assoc. works
CAPPABOY BEG, CAPPABOY BEG,
Retention of the existing electricity substation and associated facilities at Curraglass, and permission for the construction of an extension to the existing electricity substation, comprising up to 4 no. battery storage units, palisade fencing, bunded concrete plinths, associated electrical equipment, transformers and all ancillary site works
Curraglass Kealkill Co. Cork
An extension to the existing electricity substation at Curraglass, comprising of the construction of up to 4 no. battery storage units, palisade fencing, bunded concrete plinths, associated electrical equipment, transformers and all ancillary site works
Curraglass Kealkill Co. Cork
Development will consist of an extension to the existing electricity substation at Curraglass, comprising of the construction of up to 4 no. battery storage units, palisade fencing, bunded concrete plinths, associated electrical equipment, transformers and all ancillary site works
Curraglass Kealkill Bantry Co Cork
Construction of two storey extension to dwellinghouse
CURRAGLASS, CURRAGLASS,
Dwelling
Cullenagh Kealkil
Renovation of ruinous dwelling to incorporate conversion and renovation of nearby outbuilding and construction of interconnection extensions to form single dwellinghouse; Development will include: (i) raise and reconstruction of roof of ruinous dwelling and change of fenestration of same, (ii) raise of roof level of outbuilding and change of fenestration of same, (iii) construction of 2no. extensions to interconnect outbuilding and ruinous dwelling, (iv) installation of new percolation area for existing septic tank and (v) all associated site works
Cullenagh Kealkill Bantry
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?