145 Main Street Mallow Co. Cork

NEW APPLICATION

Planning application 06/55078

Cork - Cork County Council

Proposed Development

to construct 1st and 2nd floor retail and storage extension to the rear of existing premises and carryout alterations to the front elevation

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Nov 2006

  2. Decision due

    11 Jan 2007

Application Details

Location
145 Main Street Mallow Co. Cork.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
8 November 2006
Status
NEW APPLICATION
Decision
Pending
Decision Due
11 January 2007

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
23/4586CONDITIONAL30 Mar 2023

Retention permission is sought for plant at roof level. Permission is sought for the provision of a screen for the plant with a maximum height of c.2.539 metres along the edge of the roof on the western elevation.

Nos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork

18m
09/55025CONDITIONAL23 Jul 2009

material alterations to existing Davis Street elevation and removal of existing building signage and replace with new signage to their existing restaurant

144 Davis Street Mallow Co. Cork.

22m
21/5938INCOMPLETED APPLICATION12 Jul 2021

Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 No housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, and the raising of existing flat roof. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.

142/143 Bank Place Thomas Davis Street Mallow Co. Cork

22m
21/6217INCOMPLETED APPLICATION10 Aug 2021

Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 no housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, the raising of existing flat roof and the provision of balconies to apartments. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.

142/143 BankPlace/ Hibernian Way Thomas Davis Street Mallow, Co. Cork

23m
22/5695INCOMPLETED APPLICATION19 Jul 2022

Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 & 143 Bank place and existing extension to the rear of no. 142 Bank place, to provide 4 no. housing units and salon consisting of the following works: the development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian Way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanized roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5 sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use of salon (49 sq.m), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sq.m) to the rear of no 143 bank place, construction of second floor extension (14.5 sq.m) to the rear of no 142 bank place, for access to proposed apartments, modifications to elevation at first and second floors to the front of no 142 bank place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include: removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to the rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no. 142 Bank place, construction of first and second floors as constructed, metal fabrications and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian Way. The proposed development is within the mallow town centre architectural conservation area.

142/143 Bank Place, Thomas Davis Street Hibernian Way Mallow Co. Cork

23m
22/5918INCOMPLETED APPLICATION22 Aug 2022

Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 bank place and existing extension to the rear of no. 142 bank place, to provide 4 no. housing units and salon consisting of the following works: The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanised roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use to salon (49sq.m), Construction of extension of access lobby for proposed apartments at first and second floor levels (5.3sq.m.) to rear of 143 bank place, Construction of second floor extension (14.5sq.m.)to the rear of 142 bank place, for access to proposed apartments. Modification to elevation at first and seconf floors to the front of 142 Bank Place. (2) retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 & 143 bank place to include, removal of existing first and second floors and associated elements, removal of external wall to the rear of 143 at first and second floor levels. (3) retention of constructed elements listed below; external wall/flat roof to the rear of no 143 bank place as constructed, internal wall at ground floor at rear of no 142 bank place. Construction of first and seconds floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian way. The proposed development is within the mallow town centre architectural conservation area.

142/143 Bank Place, Thomas Davis Street, Hibernian Way, Mallow Co.Cork

23m
22/6166Conditional Permission28 Sept 2022

Development, reconstruction and refurbishment of existing 3 storey buildings at no’s 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 4 no. housing units and salon consisting of the following works; The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 Bank Place and a salon to the rear of 142 Bank Place at ground and first floor levels, accessed via Hibernian Way to include; (1) Permission for following: Replacement of rear of slate roof of 142 Bank Place, replacement of existing galvanized roof to the rear of first floor at 142 Bank Place, demolition and rebuilding of upper front and rear facades of 142 Bank Place, replace new windows to match existing at 143 Bank Place, openings in existing party wall between 142 and 143 Bank Place at first and second floor levels, change of use to residential of (14.5 sqm) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings. Change of use of salon (49 sqm), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sqm) to the rear of no 143 Bank Place, construction of second floor extension (14.5 sqm) to the rear of no 142 Bank Place, for access to proposed apartments, Modifications to elevation at first and second floors to the front of no 142 Bank Place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include; removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no 142 Bank Place, construction of first and second floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, Exposure of existing windows in Hibernian Way. The proposed development is within the Mallow town centre architectural conservation area.

142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork

28m
09/55048CONDITIONAL23 Dec 2009

Permission for change of use of ground and first floors of existing premises from residential use medical use

149 Bank Place Mallow Co. Cork

28m
12/55008CONDITIONAL6 Jun 2012

Permission to retain change of use of ground and first floors of existing premises from residential use to a Hair Salon this building is a protected structure

No. 149 Bank Place Mallow Co. Cork.

28m
08/55078WITHDRAWN24 Nov 2008

permission for change of use of ground floor of existing premises which is a protected structure from residential to medical use

No. 149 Bank Place Mallow Co. Cork.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.