Proposed Development
material alterations to existing Davis Street elevation and removal of existing building signage and replace with new signage to their existing restaurant
View the full application file on the council's planning portal →Application Timeline
Application received
23 Jul 2009
Decision due
16 Sept 2009
Decision: CONDITIONAL
9 Dec 2009
Grant issued
28 Jan 2010
Application Details
- Location
- 144 Davis Street Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 July 2009
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 December 2009
- Grant Date
- 28 January 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention permission is sought for plant at roof level. Permission is sought for the provision of a screen for the plant with a maximum height of c.2.539 metres along the edge of the roof on the western elevation.
Nos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork
Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 No housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, and the raising of existing flat roof. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.
142/143 Bank Place Thomas Davis Street Mallow Co. Cork
Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 no housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, the raising of existing flat roof and the provision of balconies to apartments. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.
142/143 BankPlace/ Hibernian Way Thomas Davis Street Mallow, Co. Cork
to construct 1st and 2nd floor retail and storage extension to the rear of existing premises and carryout alterations to the front elevation
145 Main Street Mallow Co. Cork.
Development, reconstruction and refurbishment of existing 3 storey buildings to consist of: 1) Change of use of ground floor office unit at No. 143 and amalgamation with ground floor retail unit at No. 142 to provide 1 no. retail unit. 2) Refurbishment of unused residential first and second floors and construction of extensions to rear with balconies to provide 2 no. apartments on each floor. 3. Partial demolition at ground, first floor and second floor levels, construction of a 3 storey extension to rear to provide access to apartments, storage, common areas and ancillary facilities. 4. Alterations to elevations, reconstruction, increase in roof height of No. 142, provision of solar panels, 2 no. security gates, lighting, signage and landscaping.
142 and 143 Bank Place Thomas Davis Street and Hibernian Way Mallow Co. Cork
Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 & 143 Bank place and existing extension to the rear of no. 142 Bank place, to provide 4 no. housing units and salon consisting of the following works: the development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian Way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanized roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5 sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use of salon (49 sq.m), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sq.m) to the rear of no 143 bank place, construction of second floor extension (14.5 sq.m) to the rear of no 142 bank place, for access to proposed apartments, modifications to elevation at first and second floors to the front of no 142 bank place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include: removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to the rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no. 142 Bank place, construction of first and second floors as constructed, metal fabrications and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian Way. The proposed development is within the mallow town centre architectural conservation area.
142/143 Bank Place, Thomas Davis Street Hibernian Way Mallow Co. Cork
Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 bank place and existing extension to the rear of no. 142 bank place, to provide 4 no. housing units and salon consisting of the following works: The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanised roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use to salon (49sq.m), Construction of extension of access lobby for proposed apartments at first and second floor levels (5.3sq.m.) to rear of 143 bank place, Construction of second floor extension (14.5sq.m.)to the rear of 142 bank place, for access to proposed apartments. Modification to elevation at first and seconf floors to the front of 142 Bank Place. (2) retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 & 143 bank place to include, removal of existing first and second floors and associated elements, removal of external wall to the rear of 143 at first and second floor levels. (3) retention of constructed elements listed below; external wall/flat roof to the rear of no 143 bank place as constructed, internal wall at ground floor at rear of no 142 bank place. Construction of first and seconds floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian way. The proposed development is within the mallow town centre architectural conservation area.
142/143 Bank Place, Thomas Davis Street, Hibernian Way, Mallow Co.Cork
Development, reconstruction and refurbishment of existing 3 storey buildings at no’s 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 4 no. housing units and salon consisting of the following works; The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 Bank Place and a salon to the rear of 142 Bank Place at ground and first floor levels, accessed via Hibernian Way to include; (1) Permission for following: Replacement of rear of slate roof of 142 Bank Place, replacement of existing galvanized roof to the rear of first floor at 142 Bank Place, demolition and rebuilding of upper front and rear facades of 142 Bank Place, replace new windows to match existing at 143 Bank Place, openings in existing party wall between 142 and 143 Bank Place at first and second floor levels, change of use to residential of (14.5 sqm) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings. Change of use of salon (49 sqm), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sqm) to the rear of no 143 Bank Place, construction of second floor extension (14.5 sqm) to the rear of no 142 Bank Place, for access to proposed apartments, Modifications to elevation at first and second floors to the front of no 142 Bank Place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include; removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no 142 Bank Place, construction of first and second floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, Exposure of existing windows in Hibernian Way. The proposed development is within the Mallow town centre architectural conservation area.
142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork
Development including partial demolition, reconstruction and refurbishment of existing 3 storey buildings at Nos 142 and 143 Bank Place, Thomas Davis Street, within Mallow Town Centre Architectural Conservation Area (ACA-1), and for demolition of the 2-storey structure accommodating 4 no. mixed commercial units, including one restaurant unit, at Hibernian Way, Mallow and replacement with 7 no. two storey terraced dwellings including a change of use from commercial to residential, on an overall site of 0.095ha. The proposed development includes the change of use of the ground floor of 143 Bank Place from commercial office to retail and its amalgamation with the retail ground floor unit at 142 Bank Place to form a single retail unit of 133 sq.m. and new shopfront. The development also includes areas of taking down and rebuilding at ground, first and second floor levels and the roof to both structures, including elements of the party wall, sections of the facade of 142 and the demolition of an existing 2-storey extension to the rear; the reconstruction to include a new roof to both 142 and 143 Bank Place, with an increase in height of the roof of no. 142, new facade arrangement to 142 including access to the Hibernian Way, and refurbishment of the upper facade of 143 to include new sash windows; new 3-storey extension to the rear to incorporate a communal access from Hibernian Way and stairway to the proposed apartments on the formerly residential , now vacant, first and second floors of 142 and 143 Bank Place and will include storage and common areas, ancillary facilities, including bicycle storage and managed waste disposal area; the works to the structures will include alterations to front elevations to Thomas Davis Street and side and rear elevations to Hibernian Way. The proposed development on Hibernian Way includes the demolition of the existing 2-storey extension to 142 (c126 sq.m), 2-storey commercial units (c.631 sq.m.) and their replacement with the construction of 7 no. two storey terraced dwellings, incorporating a change of use from commercial to residential, and the refurbishment of the surface of Hibernian Way and all associated site works. The total area to be demolished is approximately c757 sq.m. Permission is also sought for all associated site works including, but not limited to, signage, services, ancillary works and landscaping.
142 and 143 Bank Place Thomas Davis Street Mallow Co. Cork
Permission for the demolition of existing commercial units and 1 no. residential unit, part of a block wall and stone wall and the construction of 9 no. residential units in total consisting of 7 no. town houses, 2 no. apartments, hard landscaping, planters, communal storage area and associated site works. The proposed development is within the Mallow ACA.
Hibernian Way Mallow Co.Cork