← Back to search

Baltydaniel East Mallow

INCOMPLETED APPLICATION

Planning application 06/7324

Cork - Cork County Council

Application Details

Location
Baltydaniel East Mallow
Applicant
N/A
Application Type
PERMISSION CONSEQUENT
Planning Authority
Cork County Council

Timeline

Registration Date
19 May 2006Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
06/8408CONDITIONAL27 Jun 2006

Dormer bungalow

Baltydaniel East Mallow

2m
04/3000CONDITIONAL4 May 2004

Dwellinghouse

Baltydaniel East Mallow

2m
05/4842INCOMPLETED APPLICATION8 Jul 2005

Dormer dwelling

Baltydaniel East Mallow

81m
19/5612CONDITIONAL21 Jun 2019

A detached domestic garage.

Baltydaniel East Mallow Co. Cork

81m
20/4021WITHDRAWN13 Jan 2020

Permission for retention for the as built entrance walls and front boundary wall serving the dwelling house constructed under planning ref. 04/8818

Baltydaniel East Mallow Co. Cork

83m
26/1191Grant with Conditions7 May 2026

Permission for a change to condition number 11 of planning reference 24/6313, which required the northern site entrance to be blocked up. Permission is now being sought to keep the northern site entrance and to close the southern site entrance.

Baltydaniel East and Baltydaniel West, Mallow, Co. Cork. P51 WF9D

83m
24/6313Conditional Permission5 Dec 2024

1) Permission for retention of the existing dwelling as constructed (change of layout and design from that previously granted under reference number 75/925). 2) Permission for retention of the attached lean-to storage area to side of dwelling. 3) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment system. 4) Permission for retention of the existing site boundaries (change to the site boundary granted under reference 75/925).

Baltydaniel East & Baltydaniel West Mallow Co.Cork

106m
04/8823REFUSED1 Dec 2004

Dwellinghouse

Baltydaniel East Mallow

307m
17/4193CONDITIONAL1 Feb 2017

The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant

Baltydaniel West and Baltydaniel East Mallow Co.Cork

522m
16/5772CONDITIONAL15 Jul 2016

Construction of an extension to the side of an existing two storey dwelling, alterations to front elevations to include new windows, the addition of 4 no. roof lights and all associated site works.

Baltydaniel West Mallow Co. Cork

The submission window has closed

Observations on this application closed on Thursday 22 June 2006, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?