← Back to search

No.49, Ard Aoibhinn Laherfineen Innishannon

INCOMPLETED APPLICATION

Planning application 07/11297

Cork - Cork County Council

Proposed Development

Alterations to dwellinghouse

View the full application file on the council's planning portal →

Application Details

Location
No.49, Ard Aoibhinn Laherfineen Innishannon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
28 September 2007
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
07/12330CONDITIONAL13 Nov 2007

Dwellinghouse (change of plan)

No.49, Ard Aoibhinn Laherfineen Innishannon

55m
22/6741Conditional Permission13 Dec 2022

Planning permission for the construction of 15 no. houses consisting of 1 no. detached 4-bedroom two storey dwelling, 6 no. semi-detached 4-bedroom two storey dwellings, 4 no. semi-detached 3-bedroom two storey dwellings, and 4 no. terraced 3 bedroom two storey dwellings along with public open space and all associated site development works and site services.

Ard Aoibhinn Laherfineen Inishannon Co.Cork

55m
07/10356CONDITIONAL17 Aug 2007

Construction of temporary wastewater treatment plant (Change of location from that permitted under Reg. No. 99/5878)

Laherfineen Innishannon

56m
08/4580CONDITIONAL5 Feb 2008

Dwellinghouse (change of plan)

No.48, Ard Aoibhinn Laherfineen Innishannon

64m
26/2036Awaiting F.I. Response30 Jul 2026

Permission for construction of 2 no. semi-detached, 4-bedroom, two storey dwellings, along with public open space and all associated site development works and site services.

Ard Aoibhinn, Laherfineen, Inishannon, Co. Cork.

64m
26/1810Invalid - Case Closed6 Jul 2026

Construction of 2 no. semi-detached 4-bedroom two storey dwellings, along with public open space and all associated site development works and site services.

Ard Aoibhinn, Laherfineen, Innishannon

64m
24/6008Application Invalid23 Oct 2024

Permission for the construction of 2 no. semi-detached 4-bedroom two storey dwellings, along with public open space and all associated site development works and site services.

Ard Aoibhinn Laherfineen Innishannon Co.Cork

100m
19/5762REFUSED12 Jul 2019

Construction of 6 houses consisting of four no 4-bed semi-detached houses and 2 no 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary waste water treatment plant serving Ard Aoibhinn (permitted by Planning Reg. ref 07/10356), all associated site development works and services. The development will replace house no. 39 and public open space previously permitted under planning reg. ref 99/5878.

Ard Aoibhinn Laherfineen Innishannon Co. Cork

100m
21/4757CONDITIONAL26 Mar 2021

The construction of two no. 3-bed semi-detached houses, in place of one detached house on site No. 39 which was previously granted on Planning Reference 99/5878. Along with connection to the exiting temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. Ref. 07/10356), all associated site development works and services.

Ard Aoibhinn Laherfineen Innishannon Co. Cork

100m
20/5236REFUSED18 Jun 2020

The construction of four no. 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. Ref. 07/10356), all associated site development works and services. The development will replace house no. 39 and amend the public open space previously permitted under planning reg. ref 99/5878.

Ard Aoibhinn Laherfineen Inishannon Co. Cork

The submission window has closed

Observations on this application closed on Thursday 1 November 2007, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?