No.49, Ard Aoibhinn Laherfineen Innishannon
CONDITIONALPlanning application 07/12330
Cork - Cork County Council
Proposed Development
Dwellinghouse (change of plan)
Application Timeline
Application received
13 Nov 2007
Decision due
16 Jan 2008
Decision: CONDITIONAL
16 Jan 2008
Grant issued
18 Feb 2008
Application Details
- Location
- No.49, Ard Aoibhinn Laherfineen Innishannon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 November 2007
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 January 2008
- Grant Date
- 18 February 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations to dwellinghouse
No.49, Ard Aoibhinn Laherfineen Innishannon
Planning permission for the construction of 15 no. houses consisting of 1 no. detached 4-bedroom two storey dwelling, 6 no. semi-detached 4-bedroom two storey dwellings, 4 no. semi-detached 3-bedroom two storey dwellings, and 4 no. terraced 3 bedroom two storey dwellings along with public open space and all associated site development works and site services.
Ard Aoibhinn Laherfineen Inishannon Co.Cork
Construction of temporary wastewater treatment plant (Change of location from that permitted under Reg. No. 99/5878)
Laherfineen Innishannon
Dwellinghouse (change of plan)
No.48, Ard Aoibhinn Laherfineen Innishannon
Permission for construction of 2 no. semi-detached, 4-bedroom, two storey dwellings, along with public open space and all associated site development works and site services.
Ard Aoibhinn, Laherfineen, Inishannon, Co. Cork.
Construction of 2 no. semi-detached 4-bedroom two storey dwellings, along with public open space and all associated site development works and site services.
Ard Aoibhinn, Laherfineen, Innishannon
Permission for the construction of 2 no. semi-detached 4-bedroom two storey dwellings, along with public open space and all associated site development works and site services.
Ard Aoibhinn Laherfineen Innishannon Co.Cork
Construction of 6 houses consisting of four no 4-bed semi-detached houses and 2 no 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary waste water treatment plant serving Ard Aoibhinn (permitted by Planning Reg. ref 07/10356), all associated site development works and services. The development will replace house no. 39 and public open space previously permitted under planning reg. ref 99/5878.
Ard Aoibhinn Laherfineen Innishannon Co. Cork
The construction of two no. 3-bed semi-detached houses, in place of one detached house on site No. 39 which was previously granted on Planning Reference 99/5878. Along with connection to the exiting temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. Ref. 07/10356), all associated site development works and services.
Ard Aoibhinn Laherfineen Innishannon Co. Cork
The construction of four no. 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. Ref. 07/10356), all associated site development works and services. The development will replace house no. 39 and amend the public open space previously permitted under planning reg. ref 99/5878.
Ard Aoibhinn Laherfineen Inishannon Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?