Carhoo Carrigtwohill

CONDITIONAL

Planning application 07/5580

Cork - Cork County Council

Proposed Development

Construction of industrial building containing 4 no. workshops for fabrication of carbon steel and stainless steel commponents, separate management office building, industrial storage unit, ESB substation and switchroom and open storage of carbon steel and stainless steel sections and fabrications

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Mar 2007

  2. Decision due

    10 Dec 2007

  3. Decision: CONDITIONAL

    10 Dec 2007

  4. Grant issued

    18 Jan 2008

Application Details

Location
Carhoo Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
2 March 2007Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 December 2007
Grant Date
18 January 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

254m
03/590CONDITIONAL13 Feb 2003

Installation of windows and provision of two storey office area within existing industrial building

6,7 & 8, KILLACLOYNE,

302m
08/6599CONDITIONAL8 May 2008

Change of use from a warehousing unit to a materials recovery facility & vehicle parking

Carhoo Carrigtwohill

302m
08/4026INCOMPLETED APPLICATION3 Jan 2008

Change of use from warehousing unit to materials recovery facility and vehicle parking

Carhoo Carrigtwohill

689m
22/4478CONDITIONAL4 Mar 2022

The construction of a new and upgraded entrance to replace existing agricultural entrance. The new entrance is required to access lands zoned industrial.

Killacloyne Carrigtwohill Co Cork

707m
20/4090CONDITIONAL23 Jan 2020

The development will consist of (1) a single storey laboratory building to include plant and equipment area, office area, meeting rooms, canteen and kitchen, staff toilets, laboratories, IT room, electrical switch rooms and store rooms. The main laboratory building is 6.1 metres high, 44.5 metres long and 21.5 metres wide with vertical brise soleil screen offset from the southern facade. (2) An ESB substation of 3.18 metres high, 4.83 metres long and 4.32 metres wide is proposed to the rear of the building adjacent to the proposed service yard to the north of the main laboratory building. (3) The proposed development also includes 19 No. new car parking spaces comprising 2 No. visitor parking bays, 5 No. car pool parking bays. 1 No. wheelchair accessible parking bay, 2 No. dedicated electric vehicle charging bays, 2 No. motorcycle parking spaces and a covered bicycle shelter. (4) The proposed site works will include a 2.2 metre high, full perimeter security fence with new vehicular entrance gate and pedestrian turnstile entrance to the south east corner of the site, new entrance/exit to the proposed site, internal access roads pedestrian pathways, underground and overhead utilities, landscaping and all other associated site works.

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

707m
20/6074CONDITIONAL23 Sept 2020

Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

785m
21/5251CONDITIONAL10 May 2021

Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases.

Gilead Sciences Ireland UC IDA Business and Technology Park Anngrove Carrigtwohill, Co. Cork

875m
07/13099CONDITIONAL14 Dec 2007

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works

Fota Retail & Bus. Park Killacloyne Carrigtohill

875m
12/5582INCOMPLETED APPLICATION18 Jul 2012

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works, extension of duration to permission granted under planning reg 07/13099

Fota Business Park Killacloyne Carrigtohill Co. Cork

875m
13/4454UNCONDITIONAL19 Mar 2013

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works, extension of duration of permission granted under Planning Reg. No. 07/13099

Fota Business Park Killacloyne Carrigtwohill

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?