Proposed Development
Construction of slatted tank and extension to existing milking parlour
Application Timeline
Application received
28 Mar 2007
Decision: CONDITIONAL
21 May 2007
Decision due
22 May 2007
Grant issued
21 Jun 2007
Application Details
- Location
- Caherconnor Churchtown Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 March 2007Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 May 2007
- Grant Date
- 21 June 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of agricultural shed to existing machinery shed and ancillary works
Caherconnor Churchtown Mallow
Extension to agricultural machinery shed
Caherconnor Churchtown Mallow
Retention of detached domestic garage/store, timber store and partial attic conversion to include 2no. rooflights to rear of existing dwelling house. Permission to construct a new single storey extension to rear and side of existing dwelling house.
Ballynageragh Ballyhea Co. Cork
a) construct a rear extension to existing dwellinghouse, b) entrance, waste water treatment system and all other site works
Ballynageragh Ballyhea Co. Cork
Permission to amend the design of the previously approved development (pl. ref. no 20/4041) which comprises consent for a solar PV energy development . The proposed amendments include: (1) increase in number of transformers, (2) increase in size of transformers, (3) reduction in the spacing of solar PV rows (strings), (4)increase in size of solar panels, (5) reduction in the number of solar panels, (6) increase in solar panel output, (7) change in solar panel tilt (degree), (8) reduction in height of solar array, (9) omission of development within the SAC and (10)operational period is proposed to be extended from 25 to 40 years. A Natura Impact Statement will also be submitted to the planning authority for this proposed development
Ballyroe & Dromin Ballyhea Charleville Co.Cork
Dwellinghouse and waste water treatment plant
Ballynageragh Ballyhea Charleville
Retention of conversion of attic to living area
BALLYNAGERAGH, BALLYNAGERAGH,
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Coolcaum Churchtown Mallow Co.Cork
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Coolcaum Churchtown Mallow Co. Cork
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.
Ballyroe, Ballynadrideen, Dromin, Ardnageehy Rathnacally and Clashganniv Ballyhea Charleville, Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?