Ballyroe, Ballynadrideen, Dromin, Ardnageehy Rathnacally and Clashganniv Ballyhea Charleville, Co. Cork
INCOMPLETED APPLICATIONPlanning application 19/6966
Cork - Cork County Council
Proposed Development
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.
Application Timeline
Application received
13 Dec 2019
Decision due
17 Feb 2020
Application Details
- Location
- Ballyroe, Ballynadrideen, Dromin, Ardnageehy Rathnacally and Clashganniv Ballyhea Charleville, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 December 2019Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 17 February 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.
Townlands of Ballyroe, Dromin, Ballynadrideen Ardnageehy, Rathnacally and Clashganniv in Ballyhea Charleville, Co. Cork
Permission to amend the design of the previously approved development (pl. ref. no 20/4041) which comprises consent for a solar PV energy development . The proposed amendments include: (1) increase in number of transformers, (2) increase in size of transformers, (3) reduction in the spacing of solar PV rows (strings), (4)increase in size of solar panels, (5) reduction in the number of solar panels, (6) increase in solar panel output, (7) change in solar panel tilt (degree), (8) reduction in height of solar array, (9) omission of development within the SAC and (10)operational period is proposed to be extended from 25 to 40 years. A Natura Impact Statement will also be submitted to the planning authority for this proposed development
Ballyroe & Dromin Ballyhea Charleville Co.Cork
Sand and gravel quarry with an extraction area of approximately 1.7ha and all associated ancillary development works
Ballyroe Ballyhea Charleville
Construction of portal frame building consisting of offices, steel fabrication workshop and electropolishing plant
Ballyhea Charleville
Retention of extensions to existing light industrial engineering workshop: (1) extension housing gantry crane, (2) single storey extension to rear (west), (3) single storey storage tanks extension area to side (south), (4) new location of septic tank and percolation area, and (5) elevation changes and associated site works
Ballyroe Ballyhea Charleville
Retention of extension to existing light industrial engineering workshop housing gantry crane and associated site works
Ballyroe Ballyhea Charleville
Retention of Gantry Crane structure and associated site works
Ballyroe Ballyhea Charleville
Dwellinghouse
Dromin Ballyhea
Construction of slatted tank and extension to existing milking parlour
Caherconnor Churchtown Mallow
Dwellinghouse and garage
Dromin Ballyhea Charleville
The submission window has closed
Observations on this application closed on Saturday 25 January 2020, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?