Ballyroe Ballyhea Charleville
INCOMPLETED APPLICATIONPlanning application 12/4053
Cork - Cork County Council
Proposed Development
Retention of Gantry Crane structure and associated site works
Application Timeline
Application received
18 Jan 2012
Decision due
13 Mar 2012
Application Details
- Location
- Ballyroe Ballyhea Charleville
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 January 2012Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 13 March 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of extensions to existing light industrial engineering workshop: (1) extension housing gantry crane, (2) single storey extension to rear (west), (3) single storey storage tanks extension area to side (south), (4) new location of septic tank and percolation area, and (5) elevation changes and associated site works
Ballyroe Ballyhea Charleville
Retention of extension to existing light industrial engineering workshop housing gantry crane and associated site works
Ballyroe Ballyhea Charleville
Dwellinghouse and garage
Dromin Ballyhea Charleville
Permission for Retention for (a) An existing single storey sun room attached to the south western elevation of the dwelling house, (b) a first floor dormer type window on the south western elevation, (c) an existing vehicular entrance previously permitted under planning reference 08/8679 on the north eastern boundary, (d) an existing septic tank and percolation area located to the rear of the property and (e) various elevational alterations to the existing dwelling house. Permission is also sought for revisions to the existing site boundaries from the previously permitted planning permission references 08/6542 & 08/8679.
Ballinadrideen, Ballyhea, Co. Cork, P56TD98
Relocation of site entrance to existing dwellinghouse
Ballynadrideen Ballyhea
Construction of single storey and dormer extension to dwelling and fit new window to gable
Ballynadrideen Ballyhea Charleville
A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.
Ballyroe, Ballynadrideen, Dromin, Ardnageehy Rathnacally and Clashganniv Ballyhea Charleville, Co. Cork
Sand and gravel quarry with an extraction area of approximately 1.7ha and all associated ancillary development works
Ballyroe Ballyhea Charleville
Demolition of dwelling and construction of dwellinghouse and installation of effluent treatment unit
Ballynadrideen Charleville
Dwellinghouse
Ballynadrideen Charleville
The submission window has closed
Observations on this application closed on Tuesday 21 February 2012, five weeks after it was received. The authority cannot accept a late submission.