← Back to search

Dromalour Kanturk

CONDITIONAL

Planning application 08/10169

Cork - Cork County Council

Proposed Development

Alterations, extensions, ancillary site works & the partial sub-division of existing single storey warehouse (previous planning no. 06/4050), from 3no. units to 2no. units with ancillary canteen & office facilities & erection of a bunded oil storage tank to the rear of the premises. Alterations & elevational changes to include:

  1. (a)
    Unit 1 to be used as a food distribution centre, with the introduction of a dock-leveller to western end of the building, a canopy & van loading platform to the front of the building to include 5no. roller shutter dooors
  2. (b)
    Unit no.2 , the removal of existing roller shutter door to be replaced with 2no. windows & new pedestrian dooor to replace existing window
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Dec 2008

  2. Decision: CONDITIONAL

    16 Feb 2009

  3. Decision due

    19 Feb 2009

  4. Grant issued

    20 Mar 2009

Application Details

Location
Dromalour Kanturk
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 December 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 February 2009
Grant Date
20 March 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
06/4050CONDITIONAL9 Jan 2006

Construction of single storey warehouse for general storage

Dromalour Kanturk

9m
08/10020INCOMPLETED APPLICATION8 Dec 2008

Alterations, extensions, ancillary site works & the partial sub-division of existing single storey warehouse (previous planning no. 06/4050), from 3no. units to 2no. units with ancillary canteen & office facilities & erection of a bunded oil storage tank to the rear of the premises. Alterations & elevational changes to include: (a) Unit 1 to be used as a food distribution centre, with the introduction of a dock-leveller to western end of the building, a canopy & van loading platform to the front of the building to include 5no. roller shutter dooors, (b) Unit no.2 , the removal of existing roller shutter door to be replaced with 2no. windows & new pedestrian dooor to replace existing window

Dromalour Kanturk

25m
20/4908CONDITIONAL7 May 2020

(1)Construction of a warehouse to be used for storage purposes which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter ,(4) construction of concrete pavements around new building and (5) all associated site works.

Site 6 and 7 Dromalour Industrial Estate Dromalour Kanturk, Co. Cork

25m
20/4684INCOMPLETED APPLICATION2 Apr 2020

(1) Construction of a steel cladded industrial storage building which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter, (4) construction of concrete pavements around new building and (5) all associated site works.

Site 6 & 7 Dromalour Industrial Estate Dromalour Kanturk, Co. Cork

81m
05/4712CONDITIONAL4 Jul 2005

Warehouse with associated offices and bio treatment plant

Dromalour Kanturk

82m
26/2595Awaiting Admin Validation7 Oct 2026

planning permission to (A) construct a building/shed for the depollution/dismantling of end of life vehicles and install a silt trap and interceptor (B) construct a storage shed for storage vehicle parts (C) construct an office on site

Dromalour Industrial Park, Dromalour, Kanturk, Co Cork

82m
18/5319CONDITIONAL23 May 2018

To construct i) Vehicle Testing Centre (CVRT) with all associated services & site works, parking & ii) signage.

Dromalour Industrial Park Dromalour Kanturk Co. Cork

84m
04/2120REFUSED31 Mar 2004

Construction of warehouse with associated offices, site works and bio-treatment unit

Dromalour Kanturk

101m
05/9689CONDITIONAL22 Dec 2005

Site development works for 4 no. light industrial units/warehousing

Dromalour Kanturk

118m
05/32CONDITIONAL7 Jan 2005

Construction of light industrial building subdivided into 3 individual units with effluent treatment plant. Unit 1 will consist of bakery and units 2 & 3 for general light industrial use

Dromalour Kanturk

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?