← Back to search

Dromalour Industrial Park Dromalour Kanturk Co. Cork

CONDITIONAL

Planning application 18/5319

Cork - Cork County Council

Proposed Development

To construct

  1. i)
    Vehicle Testing Centre (CVRT) with all associated services & site works, parking
  2. ii)
    signage.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 May 2018

  2. Decision: CONDITIONAL

    19 Nov 2018

  3. Decision due

    21 Nov 2018

  4. Grant issued

    3 Jan 2019

Application Details

Location
Dromalour Industrial Park Dromalour Kanturk Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 May 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 November 2018
Grant Date
3 January 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
26/2595Awaiting Admin Validation7 Oct 2026

planning permission to (A) construct a building/shed for the depollution/dismantling of end of life vehicles and install a silt trap and interceptor (B) construct a storage shed for storage vehicle parts (C) construct an office on site

Dromalour Industrial Park, Dromalour, Kanturk, Co Cork

51m
05/4712CONDITIONAL4 Jul 2005

Warehouse with associated offices and bio treatment plant

Dromalour Kanturk

51m
04/2120REFUSED31 Mar 2004

Construction of warehouse with associated offices, site works and bio-treatment unit

Dromalour Kanturk

53m
05/32CONDITIONAL7 Jan 2005

Construction of light industrial building subdivided into 3 individual units with effluent treatment plant. Unit 1 will consist of bakery and units 2 & 3 for general light industrial use

Dromalour Kanturk

59m
05/9689CONDITIONAL22 Dec 2005

Site development works for 4 no. light industrial units/warehousing

Dromalour Kanturk

69m
20/4908CONDITIONAL7 May 2020

(1)Construction of a warehouse to be used for storage purposes which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter ,(4) construction of concrete pavements around new building and (5) all associated site works.

Site 6 and 7 Dromalour Industrial Estate Dromalour Kanturk, Co. Cork

69m
20/4684INCOMPLETED APPLICATION2 Apr 2020

(1) Construction of a steel cladded industrial storage building which will include a single loading dock, (2) construction of a revised vehicular entrance to suit articulated vehicles, (3) construction of a concrete wall with palisade railing around site perimeter, (4) construction of concrete pavements around new building and (5) all associated site works.

Site 6 & 7 Dromalour Industrial Estate Dromalour Kanturk, Co. Cork

75m
04/3200CONDITIONAL10 May 2004

Construction of light industrial building subdivided into 3 individual units with effluent treatment plant. Unit 1 will consist of bakery and units 2 and 3 for general light industrial use.

Dromalour Kanturk

81m
08/10020INCOMPLETED APPLICATION8 Dec 2008

Alterations, extensions, ancillary site works & the partial sub-division of existing single storey warehouse (previous planning no. 06/4050), from 3no. units to 2no. units with ancillary canteen & office facilities & erection of a bunded oil storage tank to the rear of the premises. Alterations & elevational changes to include: (a) Unit 1 to be used as a food distribution centre, with the introduction of a dock-leveller to western end of the building, a canopy & van loading platform to the front of the building to include 5no. roller shutter dooors, (b) Unit no.2 , the removal of existing roller shutter door to be replaced with 2no. windows & new pedestrian dooor to replace existing window

Dromalour Kanturk

82m
08/10169CONDITIONAL17 Dec 2008

Alterations, extensions, ancillary site works & the partial sub-division of existing single storey warehouse (previous planning no. 06/4050), from 3no. units to 2no. units with ancillary canteen & office facilities & erection of a bunded oil storage tank to the rear of the premises. Alterations & elevational changes to include: (a) Unit 1 to be used as a food distribution centre, with the introduction of a dock-leveller to western end of the building, a canopy & van loading platform to the front of the building to include 5no. roller shutter dooors, (b) Unit no.2 , the removal of existing roller shutter door to be replaced with 2no. windows & new pedestrian dooor to replace existing window

Dromalour Kanturk

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?