← Back to search

Kilpatrick Bandon

CONDITIONAL

Planning application 08/4594

Cork - Cork County Council

Proposed Development

Dwellinghouse and installation of septic tank

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Feb 2008

  2. Decision due

    1 Apr 2008

  3. Decision: CONDITIONAL

    1 Apr 2008

  4. Grant issued

    2 May 2008

Application Details

Location
Kilpatrick Bandon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 February 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 April 2008
Grant Date
2 May 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

95m
04/4322CONDITIONAL15 Jun 2004

Dwellinghouse

Kilpatrick Bandon

237m
11/5869CONDITIONAL30 Aug 2011

Demolition of existing dwellinghouse and construction of dwellinghouse and associated site works

Kilpatrick Bandon

257m
15/4395CONDITIONAL27 Feb 2015

Construct a cattle underpass beneath the public road (R589) and all asosciated siteworks

Kilpatrick Bandon

291m
05/9482CONDITIONAL19 Dec 2005

Dwellinghouse

Kilpatrick Bandon

448m
21/5958CONDITIONAL14 Jul 2021

A horticultural enterprise for the production and processing of cut flowers and flower bulbs and will involve the construction of an operations building (1632.41 sq. m), photovoltaic panels (320.00 sq. m), hardstanding and storage area, parking area, wastewater treatment system and soil polishing filter, site entrance and internal access road, water storage tank, site lighting, boundary fencing, landscaping, and all ancillary works.

Littlesilver Bandon Co. Cork

496m
20/5893INCOMPLETED APPLICATION1 Sept 2020

To demolish ruin of dwelling and permission to construct dwelling and associated site works. Permission is also sought to demolish and rebuild porch of adjacent dwelling (owned by parents of one of the applicants) and permission to replace parents existing septic tank with proprietary treatment unit. Permission is sought to lower part of boundary wall of this site.

Kilpatrick Bandon Co. Cork

496m
20/6186REFUSED7 Oct 2020

To demolish ruin of dwelling and permission to construct dwelling and associated site works. Permission is also sought to demolish and rebuild porch of adjacent dwelling (owned by parents of one of the applicants) and permission to replace parents existing septic tank with proprietary treatment unit. Permission is sought to lower part of boundary wall of this site.

Kilpatrick Bandon Co. Cork

527m
25/6877Awaiting F.I. Response19 Dec 2025

EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development at this site of c. 1.29 ha, located on lands at Littlesilver, Bandon, Co. Cork. The proposed development consists of a battery energy storage system (BESS) facility, which will comprise of rechargeable battery units contained within 28 no. c. 25 ft containers on site; 7 no. MVs units; 1 no. auxiliary transformer; a resistor, reactor and harmonic filter unit; a low voltage (LV) building and a welfare and spares container. The proposed development also involves the diversion of the existing overhead line on site and includes an underground cable, which will connect the BESS facility to the Bandon 110kV substation. The proposed development will include for the demolition and removal of the existing decommissioned wind turbine and associated outbuilding on site. The proposed development also includes the construction of a 38kV substation building with associated compounds and car parking; stock proof fencing and gateways; landscaping; foul water holding tank; rainwater harvesting tank; stone soakaways; piped infrastructure and ducting; retention basin and stone headwall; signage; security fencing; boundary treatments; lighting; CCTV; SUDs; permeable gravel area; upgrading of the existing site entrance with partial hedgerow removal; new access track and upgrading of the existing access track; and all associated site development and excavation works above and below ground. Planning permission is sought for a period of 10 years.

Littlesilver,, Bandon, Co. Cork

550m
10/6077CONDITIONAL19 Aug 2010

Demolition of existing conservatory and construction of single storey extension with refurbishments to existing dwelling and all associated works

Millwood Littlesilver Bandon Co.Cork

554m
08/6480CONDITIONAL2 May 2008

(a)Change of use from former public house and attached private dwelling to single private dwelling only (b) demolition of two-storey extension to rear of dwelling and construction of new extension (c) alterations to existing dwelling consisting of internal layout amendments, replacing 1 no. rear ground floor window with 1 no. double door and installation of 1 no. ground floor window ope in the eastern elevation (d) demolition of 3 no. farm outbuildings and construction of garage and art studio for personal use and associated site works