← Back to search

Carhoo Carrigtwohill

CONDITIONAL

Planning application 08/6526

Cork - Cork County Council

Proposed Development

Retention of the grading of access roadway with hardcore including all ancillary site works as consructed

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 May 2008

  2. Decision: CONDITIONAL

    13 Aug 2008

  3. Decision due

    14 Aug 2008

  4. Grant issued

    15 Sept 2008

Application Details

Location
Carhoo Carrigtwohill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 May 2008Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 August 2008
Grant Date
15 September 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

333m
08/6599CONDITIONAL8 May 2008

Change of use from a warehousing unit to a materials recovery facility & vehicle parking

Carhoo Carrigtwohill

333m
08/4026INCOMPLETED APPLICATION3 Jan 2008

Change of use from warehousing unit to materials recovery facility and vehicle parking

Carhoo Carrigtwohill

495m
03/590CONDITIONAL13 Feb 2003

Installation of windows and provision of two storey office area within existing industrial building

6,7 & 8, KILLACLOYNE,

737m
04/7725REFUSED14 Oct 2004

Dwellinghouse

Anngrove Carrigtwohill

737m
05/8263CONDITIONAL9 Nov 2005

Dwellinghouse

Anngrove Carrigtwohill

883m
21/5251CONDITIONAL10 May 2021

Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases.

Gilead Sciences Ireland UC IDA Business and Technology Park Anngrove Carrigtwohill, Co. Cork

963m
20/4090CONDITIONAL23 Jan 2020

The development will consist of (1) a single storey laboratory building to include plant and equipment area, office area, meeting rooms, canteen and kitchen, staff toilets, laboratories, IT room, electrical switch rooms and store rooms. The main laboratory building is 6.1 metres high, 44.5 metres long and 21.5 metres wide with vertical brise soleil screen offset from the southern facade. (2) An ESB substation of 3.18 metres high, 4.83 metres long and 4.32 metres wide is proposed to the rear of the building adjacent to the proposed service yard to the north of the main laboratory building. (3) The proposed development also includes 19 No. new car parking spaces comprising 2 No. visitor parking bays, 5 No. car pool parking bays. 1 No. wheelchair accessible parking bay, 2 No. dedicated electric vehicle charging bays, 2 No. motorcycle parking spaces and a covered bicycle shelter. (4) The proposed site works will include a 2.2 metre high, full perimeter security fence with new vehicular entrance gate and pedestrian turnstile entrance to the south east corner of the site, new entrance/exit to the proposed site, internal access roads pedestrian pathways, underground and overhead utilities, landscaping and all other associated site works.

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

963m
20/6074CONDITIONAL23 Sept 2020

Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

1.0km
21/5047REFUSED20 Apr 2021

The demolition of an existing dwelling house and associated outbuilding, and the construction of a residential development of 42 no. residential units and all ancillary site works. The proposed development consists of the construction of 4 no. 4 bedroom detached dwellings, 4 no. 4 bedroom semi-detached dwellings, 10 no. 3 bedroom semi-detached dwelling houses, 2 no. 3 bedroom townhouses and 2 no. 2 bedroom townhouses. The proposed development includes the construction of 5 no. three storey apartment buildings containing 10 no. 2 bedroom and 10 no. 1 bedroom apartment/duplex units. Ancillary site works include the provision of bicycle stores, bin store and pumping station. Vehicular access to the proposed development will be provided via a new entrance from the L-3616 with a separate pedestrian access also provided from the L-3616.

Terry's-Land Terrysland Carrigtwohill, Co. Cork

1.0km
22/4478CONDITIONAL4 Mar 2022

The construction of a new and upgraded entrance to replace existing agricultural entrance. The new entrance is required to access lands zoned industrial.

Killacloyne Carrigtwohill Co Cork