Ballybeg Newtwopothouse Limerick Rd Mallow
CONDITIONALPlanning application 08/7103
Cork - Cork County Council
Proposed Development
Construction of overground steel storage water tank and pump house
Application Timeline
Application received
4 Jun 2008
Decision: CONDITIONAL
21 Jul 2008
Decision due
29 Jul 2008
Grant issued
21 Aug 2008
Application Details
- Location
- Ballybeg Newtwopothouse Limerick Rd Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 4 June 2008
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 July 2008
- Grant Date
- 21 August 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to construct a new 520m² single-storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include (a) The addition of 9no. lorry dock levellers onto the rear of the proposed extension with canopy, (b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over, (c) Addition of 3no.lorry dock levellers onto the existing rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Masterlink Logistics Ltd Newtwopothouse Mallow Co. Cork P51X952
Permission to construct a new 520m2 single storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include a minor alteration to the existing northern boundary along with: a) The addition of 9 no. lorry dock levelers onto the rear of the proposed extension with canopy. b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over. c) Addition of 3 no. lorry dock levelers onto the rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Masterlink Logistics Ltd Newtwopothouse Ballybeg Mallow Co Cork P51 X952
Permission to construct a new 520m² single-storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include (a) the addition of 9no. lorry dock levellers onto the rear of the proposed extension (b) demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension (c) addition of 3no.lorry dock levellers onto the existing rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Masterlink Logistics Limited Newtwopothouse Mallow Co. Cork, P51X952
Permission to construct a new single storey light industrial/warehouse distribution building with ancillary office space to serve existing supply chain business. As part of the development, the applicant is seeking permission for the demolition of (a) building containing 13 no. light industrial units and (b) the demolition of an unauthorised light industrial link/infill building. The development will include car parking, cycle parking and motorcycle parking, trailer set down area, yard area, dock levellers, access roads, retaining walls, overground water storage tank and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works. In addition to these items, we are also seeking permission to install rooftop photovoltaic solar panel arrays consisting of approximately 912 m2 of solar panels to be fixed to the south western roof slopes of the proposed new single storey light industrial/warehouse distribution building.
Masterlink Logistics Limited Newtwopothouse Mallow Co. Cork
Construction of 2no. single storey buildings Block A & B containing a total of 6no. light industrial/warehouse units, and associated site development works comprising of site entrance, car parking, internal road network, footpaths, street lighting, installation of services, proprietary effluent treatment plant & percolation area all for Block A & B only, and an above ground fire fighting water storage tank, and landscaped boundary treatment
Ballybeg New Twopothouse Mallow
Demolition of building and construction of extensions to existing light industrial warehousing and distribution facility and refurbishment and change of use of second warehouse building to provide 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks
Newtwopothouse Ballybeg Limerick Rd Mallow
Extension to existing light industrial warehouse and distribution facility to include demolition of one building, extensions to existing building and refurbishment and change of use of second warehouse building to create 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks
Ballybeg Newtwopothouse Limerick Rd Mallow
Alterations to site boundaries and relocation of treatment unit previously permitted under Planning Reg. No. 07/9991 and construction of substation
Ballybeg Newtwopothouse Limerick Rd Mallow
Extension to existing light industrial, warehousing and distribution facility to include the demolition of 1 no. building and refurbishment of existing warehouse to provide 13 no. light industrial units
Newtwopothouse Ballybeg Limerick Rd Mallow
Construction of 5 no. single storey buildings, Block A to E, totalling 20 no. light industrial/warehouse units and associated site development works comprising of site entrance, car parking, internal road network, footpaths, street lighting, installation of services, perimeter palisade fence and installation of proprietary effluent treatment plant
Ballybeg Newtwopothouse Mallow