Permission to construct a new 520m2 single storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include a minor alteration to the existing northern boundary along with:
- a)The addition of 9 no. lorry dock levelers onto the rear of the proposed extension with canopy.
- b)Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over.
- c)Addition of 3 no. lorry dock levelers onto the rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Application Timeline
Application received
7 May 2025
Decision: Conditional Permission
18 Nov 2025
Decision due
25 Nov 2025
Grant issued
2 Jan 2026
Application Details
- Location
- Masterlink Logistics Ltd Newtwopothouse Ballybeg Mallow Co Cork P51 X952
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 7 May 2025
- Status
- Application Closed
- Decision
- Conditional Permission
- Decision Date
- 18 November 2025
- Grant Date
- 2 January 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to construct a new 520m² single-storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include (a) The addition of 9no. lorry dock levellers onto the rear of the proposed extension with canopy, (b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over, (c) Addition of 3no.lorry dock levellers onto the existing rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Masterlink Logistics Ltd Newtwopothouse Mallow Co. Cork P51X952
Permission to construct a new 520m² single-storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include (a) the addition of 9no. lorry dock levellers onto the rear of the proposed extension (b) demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension (c) addition of 3no.lorry dock levellers onto the existing rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.
Masterlink Logistics Limited Newtwopothouse Mallow Co. Cork, P51X952
Permission to construct a new single storey light industrial/warehouse distribution building with ancillary office space to serve existing supply chain business. As part of the development, the applicant is seeking permission for the demolition of (a) building containing 13 no. light industrial units and (b) the demolition of an unauthorised light industrial link/infill building. The development will include car parking, cycle parking and motorcycle parking, trailer set down area, yard area, dock levellers, access roads, retaining walls, overground water storage tank and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works. In addition to these items, we are also seeking permission to install rooftop photovoltaic solar panel arrays consisting of approximately 912 m2 of solar panels to be fixed to the south western roof slopes of the proposed new single storey light industrial/warehouse distribution building.
Masterlink Logistics Limited Newtwopothouse Mallow Co. Cork
Demolition of building and construction of extensions to existing light industrial warehousing and distribution facility and refurbishment and change of use of second warehouse building to provide 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks
Newtwopothouse Ballybeg Limerick Rd Mallow
Extension to existing light industrial warehouse and distribution facility to include demolition of one building, extensions to existing building and refurbishment and change of use of second warehouse building to create 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks
Ballybeg Newtwopothouse Limerick Rd Mallow
Construction of overground steel storage water tank and pump house
Ballybeg Newtwopothouse Limerick Rd Mallow
Alterations to site boundaries and relocation of treatment unit previously permitted under Planning Reg. No. 07/9991 and construction of substation
Ballybeg Newtwopothouse Limerick Rd Mallow
Extension to existing light industrial, warehousing and distribution facility to include the demolition of 1 no. building and refurbishment of existing warehouse to provide 13 no. light industrial units
Newtwopothouse Ballybeg Limerick Rd Mallow
Alterations and part demolition of existing single storey dwellinghouse and construction of 2 no. single storey extensions to front and rear of existing dwellinghouse, new wastewater treatment system and polishing filter and all associated site works
Ballybeg Newtwopothouse Mallow
Alterations and extension to dwelling
Ballybeg Newtwopothouse Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?